Provide six (6) corrected copies of each required shop drawing or similar submittal to the Owner's representative<br />

for review, approval, and return of two (2) copies. DO NOT SUBMIT without general contractor's signed stamp,<br />

indicating the general contractor has reviewed the submittal for completeness and conformance to the Contract<br />

Documents.<br />

Inform the Owner's representative by notation, or in the letter of transmittal, of any proposed deviation from the<br />

requirements of the Contract Documents.<br />

Provide required shop drawings or other submittals within time stipulated on approved progress schedule.<br />

Do not commence work requiring a shop drawing or other submittal until approval of the required submittal has<br />

been received. Such approval will be based upon a review only for conformance with the design concept of the<br />

project and with the information given in the Contract Documents, and does not relieve the contractor from<br />

responsibility for errors or omissions in the shop drawings.<br />

Schedules shall be neatly bound in hard-backed looseleaf binders. Schedules shall be completely indexed, and<br />

shall include the following items:<br />

1. Air handling unit<br />

2. Packaged rooftop unit<br />

3. Boiler<br />

4. Glycol feed system<br />

5. Cooling coils<br />

6. Heating coils<br />

7. Pumps<br />

8. Valves<br />

9. Heating hot water & chilled water specialties<br />

10. Piping systems<br />

11. Pipe supports & restraints<br />

12. Pressure gauges & thermometers<br />

13. Hot water unit heaters<br />

14. Exhaust fans<br />

15. Ventilation fan<br />

16. Boiler stack<br />

17. VAV boxes with reheat coils<br />

18. Variable frequency drive<br />

19. Filter banks<br />

20. Dampers<br />

21. Low pressure flexible ducts<br />

22. Registers<br />

23. Grilles<br />

24. Diffusers<br />

25. Roof hoods<br />

26. Louvers<br />

27. Insulation systems<br />

28. Vibration isolators<br />

29. Seismic restraints<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-7