Fan system shall not be operated to provide temporary heat or for other purposes, until the filters are in<br />

place.<br />

At time of acceptance of the work, new filter media shall be furnished and installed by the contractor.<br />

Provide one complete set of spare filter media (in addition to the new filters installed at time of acceptance)<br />

for each filter bank and store on site as directed by the owner's representative.<br />

Air filter banks shall be Cambridge, AAF, or Farr.<br />

VARIABLE AIR VOLUME RE-HEAT BOXES:<br />

Casings shall be 26 gauge galvanized with flange rectangular discharge duct connection. A one-piece<br />

aluminum backdraft damper shall be provided on the fan discharge. The damper shall be factory set and<br />

aligned to insure a precise seal. Leakage rate shall not exceed 2 percent of rated capacity at 0.5" static<br />

pressure.<br />

Automatic damper operators and controllers shall be furnished by the ATC contractor and installed by the<br />

VAV box manufacturer.<br />

The VAV box manufacturer shall furnish and install an approved cross flow sensor with a gain factor of not<br />

less than three (3).<br />

VAV boxes shall be provided with a pressure independent volume regulator which operates thru a<br />

thermostatically reset velocity controller to provide constant air delivery within plus or minus 5 percent of<br />

rated flow, and down to 25 percent of the VAV box rated CFM. Factory calibrated field adjustable setpoints<br />

shall be provided to set maximum and minimum CFM.<br />

The hot water heating coil shall be a single or multiple row unit as specified with plate-type aluminum fins<br />

and mechanically bonded to a copper tube carrier pipe.<br />

The entire unit shall be serviceable from a single ceiling access door.<br />

The sound attenuators shall be 26 gauge galvanized steel construction with high density matt-faced<br />

insulation. Insulation shall be UL listed and meet all requirements of NFPA-90A.<br />

Units shall be Metalaire, Price, Nailor or Titus.<br />

CROSS FLOW PRESSURE SENSORS FOR VAV BOXES:<br />

Sensors shall be aluminum corrosion resistant of the cross flow type with ported tubes and baffle mounted to<br />

a center manifold. The center manifold shall have 1/4" barb fittings for FRPE tubing, and shall provide a<br />

differential pressure proportional to the average velocity of air moving through duct.<br />

The sensors shall have an amplification factor (gain) of at least three and flow coefficient as follows:<br />

-<br />

___________________________________________________________________________________<br />

____________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

AIR DISTRIBUTION 15800 - 10