10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 08400 - ALUMINUM ENTRANCES AND STOREFRONTS<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 1 <strong>Specification</strong> Sections, apply to this Section.<br />

B. Provide aluminum doors and frames as shown on the drawings and specified herein.<br />

1.02 SUMMARY<br />

A. This Section includes aluminum doors and frames as shown on the drawings.<br />

B. Related Sections: The following sections contain requirements that relate to this section:<br />

1. Division 7 Section “Joint Sealants” for sealants between frame and wall.<br />

2. Division 8 Section “Glass and Glazing” for glass systems and components.<br />

3. Division 8 Section “Finish Hardware” for door hardware and Knox-Box.<br />

1.03 SUBMITTALS<br />

A. General: Submit the following in accordance with Conditions of the Contract and Division1<br />

<strong>Specification</strong>s Sections.<br />

1. Product data, including:<br />

a. <strong>Construction</strong> details and fabrication methods.<br />

b. Profiles and dimensions of individual components.<br />

c. Data on hardware, accessories, and finishes.<br />

d. Recommendations for maintenance and cleaning of exterior surfaces.<br />

2. Manufacturer’s product data and shop drawings which include the following:<br />

a. Layout and installation details, including anchors.<br />

b. Elevations of continuous work at 1/4-inch scale or greater.<br />

c. Full-size section details of typical composite members, including reinforcement.<br />

d. Hardware.<br />

e. Glazing details.<br />

f. Accessories.<br />

3. Samples for Color Selection: Submit samples of each specified finish on 12-inch-long<br />

sections of window members. Where showing the full range of variations expected.<br />

4. Certification: Provide certification by a recognized independent testing laboratory or<br />

agency showing that each type, grade, and size of window unit complies with<br />

performance requirements indicated.<br />

1.03 COORDINATION<br />

A. Coordinate work and scheduling of the work of this section with other trades for anchorage and<br />

installation of hardware.<br />

1.04 INSPECTION<br />

A. Examine all subsurface to receive work and report, in writing, to the Architect, any conditions<br />

detrimental to work. Failure to observe this injunction constitutes a waiver to any subsequent<br />

claims to the contrary. Commencement of work will be construed as acceptance of all sub<br />

surfaces.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

ALUMINUM ENTRANCES AND STOREFRONTS 08400 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!