10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. Built-in Equipment: Securely anchor units to supporting cabinets or countertops with<br />

concealed fasteners. Verify that clearances are adequate for proper functioning and rough<br />

openings are completely concealed.<br />

C. Freestanding Equipment: Place units in final locations after finishes have been completed in<br />

each area. Verify that clearances are adequate to properly operate equipment.<br />

D. Utilities: Refer to Divisions 15 and 15 for plumbing and electrical requirements.<br />

3.03 ADJUSTING AND CLEANING<br />

A. Test each item of appliances to verify proper operation. Make necessary adjustments.<br />

B. Verify that accessories required have been furnished and installed.<br />

C. Remove packing material from appliances and leave units in clean condition, ready for<br />

operation.<br />

END OF SECTION<br />

SHELLEY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

APPLIANCES 11451 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!