3.07 CURING<br />

A. Provide thorough curing of mortar joints and grout concrete pour. Keep block work damp, but<br />

not saturated, for at least 4 days to prevent from drying too rapidly during hot or drying<br />

weather or drying winds.<br />

3.08 SEALER<br />

A. Seal interior brick with two coats of brick sealer. Comply with manufacturer’s<br />

recommendations for preparation, application and coverage.<br />

B. In an inconspicuous area, apply one coat over a 4-foot by 4-foot area for Owner review and<br />

approval of sheen.<br />

C. Exterior Brick Sealer:<br />

1. Environmental Requirements:<br />

a. Minimum application temperature is 40 degrees F and rising.<br />

b. Do not apply in rain or when rain is expected within 12 hours. Do not apply<br />

below 40 degrees F or when temperatures are expected to fall below 40<br />

degrees F within 12 hours.<br />

2. Application:<br />

a. Stir product thoroughly prior to and periodically during use. Do not dilute.<br />

b. Apply by low-pressure, non-atomizing spray.<br />

c. Flood vertical surfaces to saturation by applying from the bottom up with a<br />

controlled 8 to 12 inches material rundown to ensure maximum penetration<br />

into substrate.<br />

d. Clean equipment and tools with hot soapy water. Overspray can be cleaned<br />

immediately with hot, soapy water. Dried residue can be cleaned with citrus<br />

degreaser.<br />

e. Clean up and properly dispose of debris remaining on Project site related to<br />

application.<br />

f. Remove temporary coverings and protection from adjacent Work areas.<br />

3.09 PROTECTION<br />

A. Cover masonry surfaces with waterproof paper, plastic sheet, or canvas when necessary to<br />

protect them from rain or from hot, dry weather. Surfaces not being worked on shall be<br />

protected.<br />

3.10 FIELD QUALITY CONTROL<br />

A. The Owner shall pay for masonry testing. All masonry construction requires special<br />

inspection. If necessary, re-testing shall be paid for by the Contractor at no additional cost to<br />

the Owner.<br />

B. Provide prism test samples in accordance with IBC requirements and in conformance with<br />

requirements of testing agency and deliver to testing agency. During construction shall<br />

provide samples for prism tests for every 5,000 of each different type of masonry walls.<br />

C. Continuous Special Inspection is required on all masonry during placement of reinforcement<br />

and prior to grouting. Provide copy of all special inspection reports to engineer.<br />

3.11 MASONRY CLEANING COMPOUND<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

UNIT MASONRY 04200-7