perforated panels in the computer room floors, dirty filter, duct leakage, damper leakage, equipment vibrations,<br />

correct damper operations, etc.<br />

Before any adjustments are made to water systems, the strainers shall be cleaned, temperature control valve<br />

operation shall be checked, pump rotation shall be checked, pressure reducing valves shall be adjusted, etc.<br />

It shall be the responsibility of the CAB personnel to check, adjust, and balance the components of the various<br />

systems as listed above using an applicable "proportionate balance procedure" in order that each of them will<br />

operate under optimum noise, temperature and air flow conditions in the conditioned spaces in the building<br />

"while simultaneously operating at the most energy efficient condition."<br />

During the balancing process, if abnormalities or malfunctions of equipment or components are discovered by<br />

the CAB personnel, the owner's representative shall be advised promptly so that the condition may be corrected<br />

by the project contractor. Data from malfunctioning equipment or components shall not be recorded in the final<br />

CAB report.<br />

PART 2.00 - PRODUCTS<br />

EQUIPMENT AND INSTRUMENTS:<br />

This contractor shall provide all necessary labor, equipment, scaffolding, instruments, and materials required to<br />

adjust, balance, and check all systems.<br />

PART 3.00 - EXECUTION<br />

REPORT:<br />

The activities, as described hereinbefore, will culminate in a report to be provided to the Owner's representative.<br />

This report shall be furnished in six (6) copies. One copy shall be bound in each O & M manual. The intent of<br />

the final report is to provide a reference of actual operating conditions for the building operating personnel.<br />

The CAB report shall include the following as a minimum:<br />

Preface:<br />

A general discussion of the systems, any idiosyncrasies, any problems encountered, an outline of normal<br />

sequence of operation for the HVAC system cycles, any un-corrected noise problem.<br />

Pitot Tube Traverses:<br />

For use in future trouble-shooting by maintenance personnel, all exhaust ducts, main supply ducts and return<br />

ducts will have air velocity and volume measured and recorded by the traverse method. Locations of these<br />

traverse test stations will be described on the sheet containing the data.<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

BALANCING 15043-3