SECTION 02006 - CONCRETE PAVING<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

1.2 SUMMARY<br />

A. Drawings and general provisions of the Contract, including General and<br />

Supplementary Conditions and Division 1 Summary of Work section, apply to this<br />

Section.<br />

A. This Section includes exterior cement concrete pavement for the following:<br />

1. Driveways and roadways.<br />

2. Parking lots.<br />

3. Curbs and gutters.<br />

4. Walkways.<br />

5. Unit paver base.<br />

B. Related Sections include the following:<br />

1.3 DEFINITIONS<br />

1. Division 3 Section "Concrete Work" for general building applications of concrete.<br />

2. Division 2 Section "Earth Moving" for subgrade preparation, grading, and<br />

subbase course.<br />

A. Cementitious Materials: cement alone or in combination with one or more of blended<br />

hydraulic cement, fly ash and other pozzolans, and ground granulated blast-furnace<br />

slag.<br />

1.4 SUBMITTALS<br />

A. Product Data: For each type of manufactured material and product indicated.<br />

B. Design Mixtures: For each concrete pavement mixture. Include alternate mixture<br />

designs when characteristics of materials, Project conditions, weather, test results, or<br />

other circumstances warrant adjustments.<br />

C. Samples: 10-lb sample of exposed aggregate.<br />

D. Qualification Data: For manufacturer and testing agency.<br />

E. Material Test Reports: From a qualified testing agency indicating and interpreting test<br />

results for compliance of the following with requirements indicated, based on<br />

comprehensive testing of current materials:<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION<br />

CONCRETE PAVING<br />

MARCH 2, 2009<br />

02006 - 1