epeated if samples taken daily over a period of three days show the water quality is not being maintained.<br />

Samples shall be taken only from taps located and installed in such a manner that they will not contribute any<br />

contamination. Samples shall not be drawn from hydrants or through unsterilized hose. Test samples shall be<br />

certified by a recognized and approved testing laboratory, and a certificate of acceptability shall be submitted.<br />

Written certification of the disinfecting process and purity of water samples shall be forwarded to the Owner's<br />

representative.<br />

VERIFICATION OF GRADE:<br />

The contractor shall verify with the site utilities contractor the connection of water, and waste piping<br />

systems to the mains, and shall verify the actual job site elevation and location prior to the installation of<br />

the building footings.<br />

PART 2.00 - PRODUCTS:<br />

CLEANOUTS:<br />

Approved cleanouts shall be installed in the base of each vertical drainage line, and in the horizontal line at each<br />

change in direction. In addition, there shall be cleanouts spaced at a maximum of 50' in all horizontal lines. All<br />

cleanouts shall be extended to accessible surfaces. All cleanouts to grade shall be capable of cleaning in both<br />

directions.<br />

WATER HAMMER:<br />

Provide and install stainless steel bellows type shock absorbers in the ends of all multiple fixture water lines and<br />

in piping ahead of snap-acting automatic valves.<br />

Absorbers shall be sized and located in compliance with manufacturer's recommendations for the specific<br />

application. Absorbers shall be Zurn, Wade, or Smith.<br />

Absorbers shall not be installed in inaccessible areas. Extend piping to accessible locations.<br />

FLASHINGS:<br />

All pipes passing thru the roof shall be neatly flashed.<br />

FIXTURE STOPS:<br />

All stops for plumbing fixtures shall be chrome plated McDonald or Brass Craft 1/4 turn ball valves.<br />

PLUMBING FIXTURES:<br />

This contractor shall furnish and install all fixtures shown on the architectural or mechanical drawings or<br />

specified hereinafter, clean and adjust all fixtures and replace any damaged fixtures at the contractor's<br />

_______________________________________________________________________________________<br />

________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

PLUMBING 15400-2