10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

operating parameters on programming at Cedar Ridge Elementary School for all<br />

elementary schools.<br />

B. Training<br />

1. Provide a minimum of 40 hours of on-site or classroom training throughout the<br />

contract period for personnel designated by the Owner. Each session shall be a<br />

minimum of four hours in length and must be coordinated with the building<br />

Owner. Train the designated staff of Owners Representative and Owner to<br />

enable them to:<br />

a. Proficiently operate the system.<br />

b. Understand control system architecture and configuration.<br />

c. Understand DDC system components.<br />

d. Understand system operation, including DDC system control and<br />

optimizing routines (algorithms).<br />

e. Operate the workstation and peripherals.<br />

f. Log on and off the system.<br />

g. Access graphics, point reports, and logs.<br />

h. Adjust and change system set points, time schedules, and holiday<br />

schedules. Recognize malfunctions of the system by observation of the<br />

printed copy and graphical visual signals.<br />

j. Understand system drawings, and Operation and Maintenance manual.<br />

k. Understand the job layout and location of control components. Access<br />

data from DDC controllers.<br />

m. Operate portable operator’s terminals.<br />

C. Sensor Guards<br />

1. In classrooms, media center, corridors, storage rooms, toilet rooms, exercise<br />

rooms and multipurpose rooms, room sensors shall be wall-mounted and<br />

furnished complete with a clear plastic guard sized to fit the sensor. Guards shall<br />

have key locks.<br />

D. Sensors<br />

1. Provide insulating base where thermostat is mounted on exterior walls.<br />

2. Room, duct mounted or immersion type temperature sensors shall be furnished<br />

as required for the application. Averaging element sensors shall be used<br />

whenever there is a possibility of air temperature stratification in the ductwork.<br />

Averaging sensors shall be of sufficient length to provide accurate temperature<br />

measurements.<br />

E. Labeling<br />

1. All controls except individual room controls shall be permanently labeled with an<br />

identification name and number keyed to the ATC diagrams. Labels shall be<br />

mounted on or adjacent to the device such that if the device is replaced the label<br />

remains intact. This applies to both field and panel mounted controls.<br />

F. ATC and DDC Panels<br />

1. All panels shall be listed by ETL or UL.<br />

2. Each panel cabinet shall be made of steel (not less than 16 gage) with welded<br />

seams and finished corners. Provide a full back plate and full hinged door such<br />

that the assembly provides a completely enclosed panel. The panel shall be fully<br />

painted for a finished appearance. Supply panel with key locking latch.<br />

3. Each panel shall contain all controllers, relays and all other devices related to the<br />

systems served by that panel. All devices shall be mounted inside the panel or<br />

on the face of the panel. Appropriately sized nameplates made of black plastic<br />

laminate with white engraved letters shall be used to identify all panel mounted<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION<br />

AUTOMATIC TEMPERATURE CONTROLS 15900-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!