stipulate when and how said variance will be rectified. When changes, if any, are carried out and the<br />

areas of work cleaned, the job will be considered completed and the Contract executed.<br />

2.05 RESPONSIBILITY FOR WORKMANSHIP<br />

A. Neither completion of the job nor final payment shall relieve the Contractor of responsibility for<br />

guaranteed stated in the Contract, or of responsibility for faulty materials or poor workmanship. The<br />

Contractor shall promptly remedy any defects which occur during the guarantee period. Notice of<br />

observed defects will be forwarded to the Contractor by the Owner's Authorized Representative in<br />

duplicate. Contractor will return one (1) copy of the Contract, noting thereon what action was taken.<br />

All questions arising under this article shall be decided by the Owner's Authorized Representative.<br />

2.06 TERMINATION OF CONTRACT<br />

A. The Owner's Authorized Representative reserves the right to terminate the Contract if in his<br />

reasonable opinion the Contractor is not performing the Contract as required. Owner's Authorized<br />

Representative will remunerate Contractor for work to date of termination.<br />

2.07 INURANCE<br />

A. Contractor as well as his Contractors, shall not commence work prior to obtaining the following<br />

necessary insurance policies for compensation and liability insurance to cover his workers and<br />

installation so as to offer full protection to the owner from any possible damage suit or lien. These<br />

policies shall be maintained during the life of the Contract and should be produced to the Owner's<br />

Authorized Representative upon request.<br />

2.08 COMPLIANCE WITH BUILDING CODES<br />

A. Work under this contract, plans and specification is to comply with all laws, local municipal and state<br />

codes, ordinances, rules and regulations governing or relating to the jurisdiction of this project.<br />

Should the Contractor discover any points of conflict, he shall notify the Landscape Architect at once<br />

and immediately confirm same in writing.<br />

2.09 INTERPRETATION OF DRAWINGS AND DOCUMENTS<br />

A. Should the Contractor find discrepancies in, or omissions from the drawings or specifications, or<br />

should he be in doubt as to their meaning, he shall at once notify the Landscape Architect, and<br />

immediately confirm same in writing.<br />

B. The planting design as indicted on the plans is diagrammatic. Scaled dimensions are approximate.<br />

Verify all site dimensions prior to proceeding with the work.<br />

C. Should the Owner's Authorized Representative find it necessary to issue a clarification or change, a<br />

written Addendum will be delivered to all bidders.<br />

2.10 ADDENDUM<br />

A. Any and all Addenda issued by the Owner's Authorized Representative during the time of bidding<br />

shall form a part of the drawings, specifications and Contract Documents, and shall be included by<br />

the Contractor in his proposal.<br />

B. After work has commenced, Field Change Orders or Plan Revisions will be issued to document any<br />

plan revisions.<br />

C. For additional work, a purchase order is to be issued to the Contractor prior to the execution of work<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

LANDSCAPING 02900-3