10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 06100 - ROUGH CARPENTRY<br />

PART 1 - GENERAL<br />

1.01 RELATED DOCUMENTS<br />

A. Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division-1 <strong>Specification</strong> sections, apply to this section.<br />

B. Related Sections: Sections specifying work that requires nailers and blocking include, but are<br />

not limited to the following:<br />

1. Division 7 Section “Polyvinyl-Chloride (PVC) Roofing.”<br />

2. Division 10 Section “Solid Phenolic Plastic Toilet Compartments” for partitions and<br />

screens.<br />

3. Division 10 Section “Toilet and Bath Accessories” for grab bars, mirrors, shelves and<br />

owner provided accessories.<br />

1.02 SUMMARY<br />

A. This section includes but is not limited to the following:<br />

1. Wood grounds, nailers, blocking, and plywood backing panels, including backing and<br />

blocking required to support Owner-provided equipment.<br />

B. All wood used for framing and blocking shall be fire-retardant treated. Tested for ASTM E84<br />

and shall have a flame spread not greater that 25.<br />

1.03 SUBMITTALS<br />

A. Wood Treatment Data: Submit chemical treatment manufacturer's instructions for handling,<br />

storing, installation, and finishing of treated material.<br />

B. Preservative Treatment: For each type specified, include certification by treating plant stating<br />

type of preservative solution and pressure process used, net amount of preservative retained,<br />

and conformance with applicable standards.<br />

C. For waterborne treatment, include statement that moisture content of treated materials was<br />

reduced to levels indicated, prior to shipment to project site.<br />

D. Fire-Retardant Treatment: Include certification by treating plant that treated material complies<br />

with specified standard and other requirements. Material shall bear such identification.<br />

E. Material test reports from qualified independent testing laboratory indicating and interpreting<br />

test results relative to compliance of fire-retardant-treated wood products with requirements<br />

indicated.<br />

F. Warranty of chemical treatment manufacturer for each type of treatment.<br />

G. Research reports or evaluation reports of the model code organization acceptable to<br />

authorities having jurisdiction evidencing compliance of the following wood products with<br />

specified requirements and building code in effect for Project.<br />

1. Metal framing anchors.<br />

2. Power driven fasteners.<br />

3. Fire-retardant-treated wood.<br />

SEGP LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

ROUGH CARPENTRY 06100 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!