10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

hour salt spray under ASTM B117 test method.<br />

Propeller shall be extruded aluminum airfoil design with cast aluminum hub. The blade pitch shall be factory<br />

set and locked. The hub shall be keyed and locked to the shaft utilizing two set screws or a taper lock<br />

bushing. Propeller shall be balanced in accordance with AMCA Standard 204-06.<br />

Motor shall be heavy duty type with permanently lubricated sealed ball bearings and furnished at the<br />

specified voltage, phase, and enclosure.<br />

Bearing construction shall be heavy duty regreasable ball type in a cast iron housing.<br />

Belts shall be oil and heat resistant, non-static type. Drives shall be precision machined cast iron type,<br />

keyed and securely attached to the wheel and motor shafts. Drives shall be sized for 150% of the installed<br />

motor horsepower. The variable pitch motor drive must be factory set to the specified fan RPM.<br />

Fan shall be Penn, Cook, Greenheck, Twin City or Jenn-Air.<br />

Ceiling Type:<br />

Furnish and install complete the ceiling-mounted exhaust fans shown and specified on the drawings.<br />

Fan shall have acoustically insulated housing for quiet operation. Air deliveries shall be as indicated on the<br />

drawings and shall be certified by AMCA performance tests.<br />

Fan shall have centrifugal wheel direct connected to motor. Ceiling grille shall be all aluminum construction<br />

with satin finish. Entire fan, motor, and wheel assembly shall be removable without disturbing the housing.<br />

Fan speeds shall not exceed 1100 RPM. Unit shall be complete with backdraft damper.<br />

Fan shall be Cook, Penn, Greenheck, Twin City, or Jenn-Air.<br />

AIR FILTER BANKS:<br />

Furnish and install the filtering bank systems shown and specified on the drawings. Filter banks shall be<br />

suitable for the space available. Filter banks shall be constructed and installed so as to prevent the passage<br />

of unfiltered air. Felt, rubber, or neoprene gaskets shall be provided between filter frames and unit casing,<br />

etc. Steel filter parts shall be protected against corrosion.<br />

Filter bank shall consist of 35% efficient (ASHRAE 52-76 test standard) replaceable media type air filters.<br />

The supporting front grid of each filter section shall be hinged to facilitate easy replacement of filter media.<br />

Filter frames shall be of 18 gauge galvanized steel construction with 11 gauge galvanized steel wire grids to<br />

support the media.<br />

Provide draft gauge on filter banks processing 10,000 CFM or more to indicate pressure drop across each<br />

filter bank.<br />

-<br />

___________________________________________________________________________________<br />

____________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

AIR DISTRIBUTION 15800 - 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!