A. Prior to signing the contract, the Subcontractor shall obtain Contractor’s Liability Insurance<br />

and other policies as stipulated in the General Conditions. Such policies shall be properly<br />

executed and shall have the approval of the Owner before proceeding.<br />

B. Fire insurance shall be secured by the Board of Education.<br />

1.13 TIME OF COMPLETION<br />

A. The Subcontractor agrees to complete the work required by the Contact, per the included<br />

schedule and as follows:<br />

1. All work on the Sego Lil Elementary School Classroom Addition in Lehi, Utah shall be<br />

completed per the CMGC Contract Agreement with the Owner.<br />

Date of Substantial Completion: December 31, 2009.<br />

B. The completion of work means total completion with no outstanding punch list items.<br />

1.14 MATERIALS AND SUBSTITUTIONS<br />

A. Prior to the bid opening, bidders wishing to obtain approval on brands and suppliers other<br />

than those specified by name, shall submit their requests together with full descriptive<br />

technical data and samples, to be received by the Architect not less than seven (7) calendar<br />

days before the bid opening. The material or methods substituted shall in every way perform<br />

equally to those specified, and shall fit into the space and system designated. The<br />

Subcontractor shall assume full responsibility for any effect on other items or portions of the<br />

structure influenced by these substitutions. Approval by the Architect will be in the form of an<br />

addendum to the specifications issued to all perspective bidders indicating that additional<br />

brand or brands are approved as equal to those specified.<br />

B. The bidder’s proposal shall be in strict accordance with the drawings and specifications;<br />

however, at the time of the bid opening, and attached to the Bidder’s Proposal, unless<br />

otherwise specified, the Subcontractor may offer a substitute for any material, apparatus,<br />

equipment or process indicated or specified which he considers equal in every respect to<br />

those specified. The offer shall include the difference in cost of each item, if any. If the<br />

Subcontractor does not offer any substitute in the manner required by this section, or if a<br />

substitute so offered is not deemed by the Architect to be equal or acceptable to that<br />

indicated or specified, then the Subcontractor shall furnish, erect or install the material,<br />

apparatus, equipment or process indicated or specified by name.<br />

C. The Contract will be signed on the basis of the Base Bid without reference to substitutes. The<br />

acceptance, if any, of substitutes will be made by Change Order.<br />

1.15 TAXES<br />

A. The Subcontractor shall comply with all Social Security laws, Worker’s Compensation laws<br />

and local laws. The Subcontractor shall obtain all licenses required by local, state and federal<br />

administrative authorities.<br />

B. The Alpine School District will take advantage of the Tax Exempt Law effective January 1,<br />

1996. The Tax Exempt Form TC-721 must be used by the vendor when purchasing<br />

construction materials for this project.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

INSTRUCTIONS TO BIDDERS 00100 - 3