adjacent construction, complying with SJI "<strong>Specification</strong>s", unless otherwise indicated.<br />

F. Header Units: Provide header units to support tail joists at openings in floor or roof system not<br />

framed with steel shapes. Where header reaction is more than 300 pounds and less than<br />

1000 pounds, provide diagonal support from header to nearest panel point at bottom chord of<br />

joist. Weld to top and bottom chord of joist.<br />

G. Shop Painting: Remove loose scale, heavy rust, and other foreign materials from fabricated<br />

joints and accessories before application of shop paint.<br />

Apply one coat of primer paint to steel joists, joist girders and accessories, by spraying,<br />

dipping, or other method, to provide a continuous dry paint film thickness of not less than 0.50<br />

mil.<br />

PART 3 - EXECUTION<br />

3.01 ERECTION<br />

A. Place and secure steel joists and girders in accordance with SJI "<strong>Specification</strong>s", final shop<br />

drawings, and as herein specified.<br />

B. Field Modifications: Do not modify any joist or girder, including holes through the top and<br />

bottom chords, without the written consent and direction from the manufacturer.<br />

C. Anchors: Furnish anchor bolts or other devices to be built into concrete and masonry<br />

construction. Refer to Division 4 sections for installation of anchors set in masonry.<br />

D. Placing Joists: Do not start placement of steel joists until supporting work is in place and<br />

secured. Place joists on supporting work, adjust and align in accurate locations and spacing<br />

before permanently fastening.<br />

E. Provide temporary bridging, connections, and anchors to ensure lateral stability during<br />

construction.<br />

1. Where "open-web" joists lengths are 40 feet and longer, install a center row of bolted<br />

bridging to provide lateral stability before slackening of hoisting lines.<br />

F. Bridging: Install bridging simultaneously with joist erection, before construction loads are<br />

applied. Anchor ends of bridging lines at top and bottom chords where terminating at walls or<br />

beams.<br />

3.02 FASTENING<br />

A. Field weld joists to supporting steel framework and steel bearing plates where indicated in<br />

accordance with SJI "<strong>Specification</strong>s" for type of joists used. Coordinate welding sequence and<br />

procedure with placing of joists.<br />

B. Where detailed, bolt joists and girders to supporting steel framework in accordance with<br />

details.<br />

1. Provide high-strength threaded fasteners for bolted connections of steel joists to steel<br />

columns, and at other locations where shown, installed in accordance with AISC<br />

"<strong>Specification</strong>s for Structural Joints Using ASTM A 325 or A 490 Bolts".<br />

3.03 TOUCH-UP PAINTING<br />

A. After installation, wire brush welded areas, abraded or rusty surfaces, and clean with solvent.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

STEEL JOIST AND JOIST GIRDERS 05200 - 3