SECTION l5050 - BASIC MATERIALS AND METHODS<br />

PART 1.00 - GENERAL<br />

DESCRIPTION:<br />

This section specifies the basic materials and methods to be used in Division l5 work.<br />

MATERIALS & EQUIPMENT:<br />

All materials shall be new and undamaged. Protect all stored materials and equipment from damage by the<br />

elements, including exposure to excessive heat, flooding and rain, windstorms, etc.<br />

All materials and equipment shall be installed in strict compliance with the manufacturer's recommendations.<br />

DEMOLITION:<br />

Demolition: Provide disconnection, demolition and renovation work specified under Division 15 and as indicated<br />

and scheduled on the drawings.<br />

Damage: Where pipe, ductwork, insulation or equipment to remain is inadvertently damaged or disturbed, cut<br />

out and remove damaged section and provide new pipe, ductwork, insulation or equipment of equal capacity<br />

and quality.<br />

Accessible Work: Exposed pipe and ductwork to be demolished shall be removed in its entirety.<br />

Abandoned Work: Buried pipe abandoned in place, shall be cut out approximately two inches beyond the face<br />

of adjacent construction, capped, and the adjacent surface patched to match existing finish.<br />

Removal: Equipment, piping, ductwork, etc., specified or indicated to be demolished, shall be removed from the<br />

project site and shall not be reused.<br />

Temporary Disconnection: Equipment required to be temporarily disconnected and relocated shall be carefully<br />

removed, stored, cleaned, reinstalled, reconnected and made operational.<br />

CUTTING AND PATCHING:<br />

Any cutting, patching, or filling necessary for the proper execution of this work, except as noted on drawings,<br />

shall be done by this contractor.<br />

No rough or unsightly work will be allowed.<br />

Cutting of structural members shall be done only on approval of the Owner's representative.<br />

The attention of the contractor is directed to the requirements of running pipes thru concrete slabs, walls, and<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-1