Supply air ducts operating at pressures above +2" shall be tested and made substantially airtight. Leakage<br />

shall be less than 1% of the rated air flow.<br />

Ducts including all flexible runouts shall be tested in accordance with SMACNA Duct <strong>Construction</strong><br />

Standards.<br />

After the vertical duct risers or branch ducts have all been tested and tied into the mains, and after the<br />

central station air handling apparatus has been installed, the mains shall be tested in accordance with<br />

SMACNA Duct <strong>Construction</strong> Standards.<br />

-<br />

___________________________________________________________________________________<br />

____________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

AIR DISTRIBUTION 15800 - 16