SECTION 02270 EROSION CONTROL<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. This Section covers the work required for erosion control during construction. Any local or<br />

State Agency requirements will be considered part of these specifications.<br />

B. Obtain the National Pollution Discharge Elimination System (NPDES) Permit for stormwater<br />

discharge associated with construction activity.<br />

C. Obtain a UPDES Storm Water General Permit for <strong>Construction</strong> Activities (Permit<br />

#UTR100000) or an alternate individual permit. Applications are available online at<br />

http://www.waterquality.utah.gov/updes/stormwater.htm.<br />

PART 2 - PRODUCTS<br />

2.1 SILT FENCE<br />

A. Silt fence shall be a woven fabric that meets the following criteria:<br />

2.2 STRAW BALES<br />

Property Unit Test Method Values<br />

Grab Strength lbs ASTMD-4632 90 min<br />

Grab Elongation % ASTMD-4632 40 max<br />

Water Flow Rate gal/min/ft 2 ASTMD-4491 15 min<br />

Ultraviolet Stability% ASTMD-4355 70% min<br />

A. Straw Bales shall be clean free of dirt, hay, grass or weeds. They shall be bound with twine<br />

or wire. Bales when placed shall be dry and capable of passing water<br />

B. Stakes shall be 2" x 2" x 4 feet, hardwood or 4 feet, #4 rebar<br />

PART 3 - EXECUTION<br />

A. Silt fence and/or Bales shall be placed in accordance with plans and details. The placement<br />

of silt fence and/or bales shall consider drainage paths and intercept drainage prior to leaving<br />

the site or entering a storm sewer system. Removal of silt and replacement of silt fence<br />

and/or bales shall be on going through the duration of the project to maintain an effective silt<br />

removing barrier.<br />

B. Sediment Basin and/or sinks shall be constructed to dimensions shown on the plans. The<br />

basins and/or sinks shall be cleaned as required to maintain specified size and depth.<br />

C. All temporary grading of drainage channels, slopes or fills shall be in accordance with Section<br />

02003 Earth Moving.<br />

END OF SECTION 02270<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

EROSION CONTROL 02270 - 1