shown. Fill cells with reinforcing steel solid with grout. Clean units before laying. Use masonry<br />

saw for cutting.<br />

B. Build to preserve the unobstructed vertical continuity of cells. Vertically align sufficiently to<br />

maintain a clean unobstructed vertical opening not less than 3" in all directions.<br />

C. Lay up units in uniform running bond.<br />

D. Masonry units shall be laid in a full mortar bed on all surfaces including cross walls. Buttering<br />

only those edges which show in laying masonry units shall not be allowed. Interlock units at<br />

wall intersections unless otherwise indicated. Toothing shall not be allowed, unless otherwise<br />

shown. Tool concave joints in all masonry work, unless noted otherwise.<br />

E. Miscellaneous workmanship shall comply with the latest edition of the International Building<br />

Code unless a higher standard is required.<br />

F. Where masonry is exposed to earth, install vapor retarder from top of footing to one inch from<br />

top of the concrete slab-on-grade.<br />

3.04 REINFORCEMENT<br />

A. Refer to Section 03300 and Structural Notes on the drawings for general requirements.<br />

B. Splice all bars the minimum shown on the Structural Drawings.<br />

C. Place reinforcing and dowels before pouring grout. Tie reinforcing to dowels.<br />

D. Dowel vertical reinforcing bars out of structure below and above with bars of same size and<br />

spacing with lap length as shown on the structural drawings<br />

E. Masonry bond beams: Place horizontal bars in 8" deep bond beam units at top and bottom of<br />

wall and 48" o.c. maximum between. Continue bond beam units and reinforcement<br />

uninterrupted around corners and across wall intersections.<br />

F. Place additional vertical bars of same size as normal vertical reinforcement at corners and<br />

jambs of openings and at beam bearing locations not otherwise detailed.<br />

3.05 MORTAR<br />

A. Mix mortar in mechanical type batch mixer. Hand mix only with approval of Architect. Mix for<br />

not less than 3 minutes after all materials, including water, are in the drum. When mixing by<br />

hand, mix until mortar is uniformly blended.<br />

B. Mix in quantities required for immediate use and place before bad loss of slump occurs.<br />

Retempering after mortar has begun to set will not be allowed.<br />

3.06 GROUT<br />

A. Place grout by approved grout pump, capable of handling at least 12 cubic yards per hour of<br />

the specified aggregate mix, or by other method approved by Architect. Cells shall be grouted<br />

in lifts not to exceed 4 ft. maximum. Stop grout 1-1/2" below top of course to form key at pour<br />

joint. All grout to be vibrated in place, without segregation of aggregate, using a mechanical<br />

or electrical vibrating rod of size recommended by BIA. Do not use mortar for grout.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

UNIT MASONRY 04200-6