10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.06 SUBSTITUTIONS<br />

A. If the Contractor wishes to substitute any equipment or materials for those<br />

equipment or materials listed on the irrigation drawings and specifications, he may do so<br />

by providing the following information of the Owner's authorized representative for<br />

review:<br />

1) Provide a statement indicating the reason for making the substitution. Use a<br />

separate sheet of paper for each item to be substituted.<br />

2) Provide descriptive catalog literature, performance charts and flow charts for each<br />

item to be substituted.<br />

3) Provide the amount of cost savings if the substituted item is approved.<br />

B. The Owner's authorized representative shall have the sole responsibility in<br />

accepting or rejecting any substituted item as an approved equal to those equipment and<br />

materials listed on the irrigation drawings and specifications.<br />

1.07 Guarantee<br />

A. The guarantee for the sprinkler irrigation system shall be made in accordance with the<br />

following form. The general conditions and supplementary conditions of these<br />

specifications shall be filed with the Owner or his representative prior to acceptance of<br />

the irrigation system.<br />

B. A copy of the guarantee form shall be included in the operations and maintenance<br />

manual.<br />

C. The guarantee form shall be retyped onto the Contractor's letterhead and contain<br />

the following information:<br />

GUARANTEE FOR IRRIGATION SYSTEM<br />

We hereby guarantee that the sprinkler irrigation system we have furnished and installed<br />

is free from defects in materials and workmanship, and the work has been completed in<br />

accordance with the drawings and specifications, ordinary wear and tear and unusual<br />

abuse, or neglect excepted. We agree to repair or replace any defects in material or<br />

workmanship which may develop during the period of one year from the date of<br />

acceptance and also to repair or replace any damage resulting from the repairing or<br />

replacing of such defects at no additional cost to the Owner. We shall make such repairs<br />

or replacements within a reasonable time, as determined by the Owner, after receipt of<br />

written notice. In the event of our failure to make such repairs or replacements within a<br />

reasonable time after receipt of written notice from the Owner, we authorize the Owner to<br />

proceed to have said repairs or replacements made at our expense and we will pay the<br />

costs and charges therefore upon demand.<br />

PROJECT:<br />

LOCATION:<br />

SIGNED:<br />

ADDRESS:<br />

________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

UNDERGROUND IRRIGATION SYSTEMS 02810-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!