10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Division 1500-S-4 - Finish System Standards. Factory finish to be water based stain and<br />

ultraviolet (UV) cured polyurethane sealer to comply with EPA Title 5 guidelines for Volatile<br />

Organic Compounds (VOC) emissions limitations.<br />

1. Performance Standard: TR-6 catalyzed polyurethane.<br />

2. Color: Clear<br />

B. Install factory finished doors just prior to substantial completion.<br />

PART 3 - EXECUTION<br />

3.01 INSTALLATION<br />

A. Hang doors in adequately secured, square and plumb frames with clearances of not more<br />

than 3/32" at each side and head; clearance at bottom 1/2" or as required for floor finish.<br />

B. Install storage room doors in accordance with NFPA pamphlet No. 80.<br />

3.02 INSTALLATION OF DOORS<br />

A. Assemble and set all doors. Attach all subframes and special anchors. Fit all doors accurately<br />

to their frames with even margin at top and jambs and with proper clearance at threshold.<br />

Remove and reset doors and hardware for the installation of work of other trades.<br />

B. Trim non-rated door width by cutting equally on both jamb edges.<br />

C. Trim door height by cutting bottom edges to a maximum 3/4 inch.<br />

D. Trim fire door height at bottom edge only, in accordance with fire rating requirements.<br />

E. Pilot drill screw and bolt holes using templates provided by hardware manufacturer.<br />

F. Coordinate installation of doors with installation of frames and hardware<br />

G. Coordinate installation of glass and glazing.<br />

H. Reseal or refinish any doors that required site alteration.<br />

3.03 WARRANTY TOLERANCES<br />

A. Conform to WDMA standards and testing methods for warp, cup, bow and telegraphing.<br />

3.04 ADJUSTING<br />

A. Adjust work under provisions Division 1.<br />

B. Adjust doors for smooth and balanced door movement.<br />

3.05 CLEANUP<br />

A. Refer to Section 01700.<br />

B. Hardware shall be thoroughly cleaned. Care shall be taken to protect doors and hardware<br />

until completion of Work.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2,2009<br />

WOOD DOORS 08200 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!