10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Type S-12, bugle head, self-tapping, rust-resistant, fine thread for heavy-steel gauge<br />

(12 to 22).<br />

2. Type S, bugle head, rust-resistant sharp point, fine thread for light-gauge metal<br />

framing or furring.<br />

D. Sealants, caulk and tape:<br />

1. Dow Corning 795, Pecora 895, or equivalent.<br />

2. 2" wide 10 x 10 glass mesh Quick Tape or equivalent<br />

2.06 FABRICATION<br />

A. General: Framing components may be prefabricated into assemblies prior to erection.<br />

Fabricate panels plumb, square, true to line and braced against racking with joints welded.<br />

Perform lifting of prefabricated panels in a manner to prevent damage or distortion.<br />

B. Fabricate panels in jig templates to hold members in proper alignment and position and to<br />

assure consistent component placement.<br />

C. Fastenings: Attach similar components by welding. Attach dissimilar components by welding,<br />

bolting, or screw fasteners, as standard with manufacturer.<br />

D. Wire tying of framing components is not permitted.<br />

E. Fabrication Tolerances: Fabricate panels to a maximum allowable tolerance variation from<br />

plumb, level, and true to line of 1/8" in 10'-0".<br />

PART 3 - EXECUTION<br />

3.01 INSTALLATION<br />

A. General: Install metal framing systems in accordance with manufacturer's printed or written<br />

instructions and recommendations.<br />

B. Runner Tracks: Install continuous tracks sized to match studs. Align tracks accurately to<br />

layout at base and tops of studs.<br />

1. At concrete, attach with Hilti X-DNI47P8 fasteners (or equal) at 12 inches on center,<br />

staggered.<br />

2. At steel beams, attach with Hilti X-DNI27P8 fasteners (or equal) at 12 inches on<br />

center, staggered.<br />

3. Provide fasteners at corners and ends of tracks.<br />

4. Provide slip tracks where top of wall occurs under structural beams. Installation to<br />

accommodate an deflection of ! inch or less.<br />

C. Installation of Wall Studs: Secure studs to top and bottom runner tracks by either welding or<br />

screw fastening at both inside and outside flanges.<br />

1. Screws: #10 minimum.<br />

D. Set studs plumb, except as needed for diagonal bracing or required for non-plumb walls or<br />

warped surfaces and similar requirements.<br />

E. Where stud system abuts structural columns or walls, including masonry walls, anchor ends<br />

of stiffeners to supporting structure.<br />

F. Install supplementary framing, blocking and bracing in metal framing system wherever walls<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

COLD-FORMED METAL FRAMING 05400 - 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!