SECTION 07430 - COMPOSITE PANELS<br />

PART 1 – GENERAL<br />

1.01 SUMMARY<br />

A. Section includes: Composite panels, including:<br />

1. High Performance Rout and Return Dry System with PE Core Alucobond !<br />

B. Related Sections: Section(s) related to this section include but are not limited to:<br />

1. Structural Framing: Division 5 Section “Cold-Formed Metal Framing.”<br />

2. Wood Blocking: Division 6 Section “ Rough Carpentry.”<br />

3. Flashing and Sheet Metal: Division 7 Section “Flashing and Sheet Metal.”<br />

4. Sealants (not specified in this section): Division 7 Section “Joint Sealants.”<br />

5. Windows: Division 8 Section “Aluminum Entrances and Storefronts.”<br />

6. Translucent Panels: Division 8 Section “Insulated Translucent Sandwich Panel<br />

Wall/Roof System.<br />

1.02 SYSTEM DESCRIPTION<br />

A. Provide a watertight Rout and Return Dry panel system, as detailed on the drawings. The<br />

panel system must consist of a dry gasket interlocking system. Any panel system utilizing a<br />

continuous field applied joint sealant is unacceptable.<br />

B. The panel system as detailed, shall consist of concealed dry gasketed perimeter extrusions,<br />

extruded stiffeners, gaskets, fasteners and may consist of related flashings (where architectural<br />

drawings indicate they are to be furnished under this specification section), sealants between<br />

jamb panels and previously installed adjacent construction, and other miscellaneous<br />

accessories required for a complete watertight installation. Assembly shall be water and airtight<br />

without reliance on a secondary backup membrane.<br />

1.03 SUBMITTALS<br />

A. Pre-bid submittals:<br />

1. Project Listings: Submit five (5) listings of projects of similar scope and character,<br />

photographs of existing installations. Include the contact names and phone numbers<br />

for the representatives of the Owner, Architect and Contractor for each of the projects.<br />

2. Documents: Demonstrating product compliance with the local building code shall be<br />

submitted prior to the bid. The architect prior to the bid date must approve alternate<br />

materials and wall systems.<br />

3. Substitutions: Any proposed system must comply with the Substitution Section 1.04 B<br />

and submit the following:<br />

a. Prior to bid approval, submit the following ten (10) days prior to the bid date:<br />

(1) Sample: Panel system specifications and 24” x 24” sample fabricated<br />

showing the typical 4-way intersection, with perimeter extrusions and<br />

stiffeners. Samples must be accessible from the backside.<br />

(2) Details: Details and installation instructions showing typical edge<br />

conditions, corners joints, terminations and 4-way intersections.<br />

Details must include sealing instructions.<br />

(3) Test Reports: Independent laboratory test results certifying that the<br />

proposed panel system meets or exceeds all the tests required in this<br />

specification.<br />

b. Submit the following with the bid after the substitution has been approved:<br />

________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

COMPOSITE PANELS 07430 - 1