10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

h. Flammability: ASTM E-648, Class 1<br />

i. Smoke Developed: ASTM E-662, less than 450<br />

j. Size: 24 inches by 24 inches.<br />

k. Color: As selected by Architect.<br />

2. Style: Lees Step Up<br />

a. Style Number: DD763<br />

b. Face Yarn: Fortis Nylon 6.6 with Nylon 6.6 scraper yarn<br />

c. Tufted Weight: 38.0 ounces per square yard.<br />

e. Gauge: 5/32”.<br />

f. Secondary Backing: Fiberglass reinforced thermoplastic composite.<br />

g. Dye Method: Yarn dyed.<br />

h. Flammability: ASTM E-648, Class 1<br />

i. Smoke Developed: ASTM E-662, less than 450<br />

j. Size: 24 inches by 24 inches.<br />

k. Color: As selected by Architect.<br />

D. Accessories:<br />

1. Adhesive: Manufacturer’s pressure sensitive adhesive.<br />

PART 3 - EXECUTION<br />

3.01 INSTALLATION<br />

A. Examine areas and conditions under which work is to be performed and identify conditions<br />

detrimental to proper installation.<br />

1. Do not proceed until unsatisfactory conditions have been corrected.<br />

2. Comply with manufacturer’s recommendations for installation over new concrete<br />

surfaces.<br />

B. Install mats per manufacturer’s recommendations.<br />

1. Quarter turn the carpet tiles.<br />

2. Coordinate top of mat surfaces with bottom of doors that swing across mats to<br />

provide ample clearance between door and mat.<br />

3. Apply adhesives at rates indicated by manufacturers.<br />

C. Provide transition elements at all dissimilar finish materials as described in the drawings and<br />

below:<br />

1. Install resilient edge strip at edge between entry mat and vinyl composition tile.<br />

3.02 CLEANING AND PROTECTION<br />

A. Defer installation of floor mats until time of Substantial Completion.<br />

B. Clean mats and remove any debris from project site.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

ENTRANCE MATS 12670 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!