10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The contractor shall remove all stains or grease marks on walls, floors, glass, hardware, fixtures, or elsewhere,<br />

caused by his workman or for which he is responsible. He shall remove all stickers on plumbing fixtures, do all<br />

required patching up and repair all work of others damaged by this division of the work, and leave the premises<br />

in a clean and orderly condition.<br />

INSTRUCTIONS TO OWNER'S REPRESENTATIVES:<br />

The mechanical contractor shall provide, without expense to the Owner, competent instructors to train the<br />

Owner's representatives in the care, adjustment, maintenance, and operation of all parts on the heating, air<br />

conditioning, ventilating, plumbing, fire protection, and automatic temperature control systems and equipment.<br />

Instruction date shall be scheduled at the time of final inspection. A written report specifying times, dates, and<br />

name of personnel instructed shall be forwarded to the Owner's representative.<br />

PROTECTION AGAINST THE ELEMENTS:<br />

The contractor shall, at all times, take reasonable and adequate precautions to protect his work and all stored<br />

materials and equipment from damage by the elements, including flooding, windstorms, etc., and shall not<br />

expose the work of any other contractor to such damage.<br />

In addition to requirements specified in Division 01, stored material shall be readily accessible for inspection by<br />

the Owner's representative until installed.<br />

All items subject to moisture damage, such as controls, shall be stored in dry, heated spaces.<br />

Protect all bearings during installation, and thoroughly grease steel shafts to prevent corrosion.<br />

REMOVAL OF DEBRIS, ETC.:<br />

Upon completion of this division of the work, remove all surplus material and rubbish resulting from the work, and<br />

leave the premises in a clean and orderly condition.<br />

MOTORS & STARTERS:<br />

This contractor shall furnish all motors required and necessary to operate equipment furnished by him. The<br />

voltage, phase, and horsepower of each motor shall be coordinated with the electrical contractor prior to<br />

ordering.<br />

OPENINGS FOR MECHANICAL SYSTEMS:<br />

All openings required for installation of mechanical systems shall be provided by the mechanical contractor. Any<br />

piece of equipment which is to be installed in any space of the building and which is too large to permit access<br />

through stairways, doorways or shafts shall be brought to the job by the Contractor involved and placed in the<br />

space before the enclosing structure is completed. Materials shall be delivered at such stages of the work as will<br />

expedite the work as a whole.<br />

SAFETY REGULATION:<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!