mechanical equipment.<br />

Shop drawings submitted for earthquake bracing and anchors shall bear the Engineer's signed professional<br />

seal.<br />

The above qualified seismic engineer shall determine specific requirements on equipment anchorage and<br />

restraints, locations and sizes based on shop drawings for the mechanical equipment which have been<br />

submitted, reviewed and accepted by the Owner's representative for this project.<br />

The Division 15 contractor shall require all equipment suppliers to furnish equipment that meets the seismic<br />

code, with bases designed to receive seismic bracing and/or anchorage. All isolated mechanical equipment<br />

bracing to be used in the project shall be designed for the equipment shop drawings and certified correct by the<br />

equipment manufacturer for Seismic Zone 3 with direct anchorage capability.<br />

Submit shop drawings, calculations, and printed data for the following items under provisions of the General<br />

Conditions of the Contract:<br />

1. <strong>Complete</strong> engineering calculations and shop drawings for all vibration and seismic requirements for all<br />

equipment to be isolated and restrained.<br />

2. The professional seal of the engineer who is responsible for the design of the Vibration and Seismic<br />

restraint System for isolated equipment.<br />

3. Details for all the isolators and seismic bracing with snubbers proposed for items in this specification<br />

and on the drawings.<br />

4. Details for steel frames, concrete inertia bases, and anchors to be used in conjunction with the isolation<br />

of the items in this specification and drawings.<br />

5. Clearly outlined procedures for installing and adjusting the isolators, seismic bracing anchors and<br />

snubbers.<br />

6. The location of all restraints of pipes and ducts with the locations shown on a floor plan noting the size<br />

and type of anchorage and restraint to be used.<br />

Snubbers:<br />

Snubbers shall be double acting and consist of interlocking steel members restrained by replaceable shock<br />

absorbent elastomeric materials a minimum of 3/4 inch thick.<br />

Snubbers shall be manufactured with an air gap between hard and resilient material of not less than 1/8 inch nor<br />

more than 1/4 inch.<br />

A one "g" minimum vertical and lateral level shall be used in the design of all snubbers restraining isolated<br />

equipment.<br />

Design and Installation:<br />

General: All mechanical equipment, piping and ductwork shall be braced, anchored, snubbed or supported to<br />

withstand seismic disturbances and remain operational. Provide all engineering, labor, materials and equipment<br />

for protection against seismic disturbances as specified herein.<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-18