SECTION 15400 - PLUMBING<br />

PART 1.00 - GENERAL<br />

SCOPE OF WORK:<br />

Piping diagrams are schematic and indicate preferred pipe routing. It is the intent that the installation be<br />

complete. Where fixtures are not shown connected to any required services, they shall be connected properly<br />

and completely. Connect all fixtures to various services, i.e., hot water, cold water, waste, and vent, etc., as<br />

required.<br />

The work shall include furnishing of all materials and labor required for the job as described, together with all<br />

accessories and trim implied or required to finish the work, and generally as follows:<br />

1. <strong>Complete</strong> rain removal system, including piping and roof drains.<br />

2. Plumbing fixtures and water supply piping.<br />

3. Sanitary sewer systems.<br />

4. Condensate drain systems.<br />

STANDARDS:<br />

Plumbing installation shall be made in accordance with the International Plumbing Code, City Code, and all other<br />

governing codes.<br />

In the event drawings violate the codes as being locally enforced, the contractor shall base his estimate on the<br />

enforced code requirements.<br />

DISINFECTING:<br />

After flushing the mains, introduce a water and chlorine solution concentrated to 300 PPM to disinfect the system<br />

and oxidize piping contaminates. Retain treated water and chlorine for a period of not less than three hours or<br />

more than six hours before final flushing out of system.<br />

All valves should be opened periodically during the process and the residual chlorine checked to ensure that at<br />

least 50 percent of the initial concentration is present to complete the disinfection. If there is less than 50<br />

percent, the valves should be allowed to drain water until the 50 percent or greater level is obtained. A make-up<br />

chlorine solution of a concentration equal to the initial concentration must be added as needed during the<br />

withdrawal of the spent solution.<br />

A warning sign shall be conspicuously posted at each water outlet and faucet during the disinfecting process to<br />

prevent occupants from drinking the water.<br />

Flushing: Following disinfection, all treated water shall be flushed from the system through its extremities.<br />

Flushing shall continue until samples show that the quality of the water delivered is comparable with the quality<br />

of the public water supply and satisfactory to the public health authority having jurisdiction. Flushing shall be<br />

_______________________________________________________________________________________<br />

________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

PLUMBING 15400-1