changes in direction.<br />

It shall be each contractor's responsibility to verify exact location, elevation, and/or route of the various<br />

mechanical system components with architectural details and with Owner's representative's personnel on job.<br />

Where deviations from locations and/or arrangements described are necessary to meet actual job conditions,<br />

the changes shall be made without cost to the Owner.<br />

The Owner's representative reserves the right to make any reasonable change in location of any outlet, piping,<br />

or equipment, before installation, without additional cost.<br />

LOCATION OF CEILING OUTLETS:<br />

This contractor shall assist the Owner's representative, General Contractor, Electrical Contractor and other<br />

interested parties in the establishment of room centerlines, axis of rooms and all walls.<br />

All grilles, registers, ceiling diffusers, etc. shall be located with reference to these established data points.<br />

These outlets shall be referenced to such features as room centerlines, walls and ceiling furrings, balanced<br />

border widths, etc.<br />

Outlets in acoustical tiles, panels, etc. shall occur in joints or centers of whole pieces, etc.<br />

The final determination of the exact location of all outlets shall be subject to the direction and approval of the<br />

Owner's representative.<br />

PROVISIONS FOR REMOVAL & ADEQUATE CLEARANCE:<br />

Install Mechanical work to permit removal of cooling coils, filters, belt guards, sheaves, drives, and other parts<br />

requiring periodic replacement or maintenance without damage to or interference with other parts of equipment<br />

or structure.<br />

Arrange pipes, ducts, and equipment to permit ready access to valves, cocks, traps, starters, motors, control<br />

components, and to clear the openings of swinging doors and access panels.<br />

RECORD DRAWINGS:<br />

The contractor shall maintain one set of record drawings. These prints shall show the location, elevations and<br />

details of all items of work installed under this contract. Buried piping shall be located by dimensions from<br />

foundation walls and depths of bury shall be indicated. These shall be marked in red. The completed set of<br />

record drawings must be submitted to the Owner's representative before the contractor is eligible to receive the<br />

final payment. An up-to-date record set of drawings shall be maintained during the progress of the project, and<br />

be available to the Owner's representative upon request.<br />

COORDINATION DRAWINGS:<br />

The contractor shall provide coordination drawings, when requested by the Owner's representative, to insure<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-5