and mullions shall not exceed 4 for each 40 sq. ft. of panel, nor shall they be more than 3/64"<br />

in width.<br />

N. Where practical, pre-assemble and seal panels and aluminum perimeter frame at the factory.<br />

Ship panels to the job site packaged to prevent damage and ready for erection.<br />

O. Perimeter Closure System, Battens and Aluminum Finishes:<br />

1. Closure System: Extruded 6063-T6 and 6063-T5 aluminum clamp-rite screw type.<br />

2. Aluminum Closures: Supply with 300 series stainless steel screws (excluding final<br />

fasteners to building) and factory sealed to the panels. Field install aluminum battens<br />

and cap plates.<br />

3. All exposed aluminum to be architectural corrosion resistant finish which meets the<br />

performance requirements of AAMA 2604. For bidding purposes, provide the<br />

following colors from Kalwall Corporation or similar colors from other manufacturers.<br />

Actual color selection may vary.<br />

a. Exterior Metal Finish Color: Brick #88<br />

b. Interior Metal Finish Color: Bone White #21B.<br />

4. Flexible Sealing Tape: Manufacturer’s standard pre-applied to serrated edges of<br />

closure system at factory under controlled conditions.<br />

PART 3 - EXECUTION<br />

3.01 EXAMINATION<br />

A. Do not install systems until conditions adversely affecting installation and performance have<br />

been corrected.<br />

3.02 PREPARATION<br />

A. Prepare openings including isolating dissimilar materials from aluminum system which may<br />

cause damage by electrolysis. Provide temporary enclosures if required, to protect interior<br />

from weather, theft or vandalism.<br />

3.03 INSTALLATION<br />

A. The installer shall erect translucent panel system in strict accordance with approved shop<br />

drawings as supplied by manufacturer, including fastening and sealing. Clean aluminum<br />

before sealants are applied.<br />

B. Secure non-moveable joints, and accommodate thermal and mechanical movements.<br />

C. If required, insure weep holes are correctly installed.<br />

D. After other trades have completed work on adjacent material, inspect translucent panel<br />

installation and make any adjustments necessary to insure proper installation and weathertight<br />

conditions.<br />

3.03 CLEANING<br />

A. Clean both sides of panel system after installation, according to manufacturer’s<br />

recommendations.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION<br />

INSULATED TRANSLUCENT SANDWICH PANEL WALL/ROOF SYSTEM 08950 - 5