10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.01 PREPARATION<br />

A. At the Contractor's direction, glazier, sealant, and gasket manufacturers' technical<br />

representatives, glass framing erector and other trades whose work is affected by glass and<br />

glazing shall meet at project site to review procedures and time schedule proposed for<br />

glazing and coordination with other trades.<br />

B. Clean glazing channels and other framing members to receive glass, immediately before<br />

glazing. Remove coatings which are not firmly bonded to substrates. Remove lacquer from<br />

metal surfaces where elastomeric sealants are to be used.<br />

3.02 FABRICATION OF GLASS AND OTHER GLAZING PRODUCTS<br />

A. Fabricate glass and other glazing products in sizes required to glaze openings indicated for<br />

Project, with edge and face clearances, edge and surface conditions, and bite complying with<br />

recommendation of product manufacturer and referenced glazing standard as required to<br />

comply with system performance requirements.<br />

3.03 INSTALLATION<br />

A. Have surfaces receiving glass clean, dry and free of foreign matter. Prepare, clean and prime<br />

surfaces to which sealant is to be applied, per sealant manufacturer's recommendations.<br />

B. Install glass type at locations shown on drawings and according to glass manufacturers<br />

recommended maximum size limitations and placement of any setting blocks. Make all<br />

adjacent glass in same glazed areas consistent in type and thickness unless otherwise noted<br />

or directed.<br />

C. Keep labels indicating manufacturer, quality, and thickness on glass until it has been<br />

approved by Architect. Absence of label constitutes cause for rejection.<br />

D. Install setting blocks of proper size in sill rabbet, located one quarter of glass width from each<br />

corner, but no closer than 6", unless otherwise required. Set blocks in thin course of sealant<br />

which is acceptable for heel bead use.<br />

E. Provide spacers inside and out, of correct size and spacing to preserve required face<br />

clearances, for glass sizes larger than 50 united inches, except where gaskets or glazing<br />

tapes with continuous spacer rods are used for glazing. Provide 1/8" sealant width, except<br />

with sealant tape use thickness slightly less than final compressed thickness of tape.<br />

F. Provide edge blocking to comply with requirements of referenced glazing standard, except<br />

where otherwise required by glass unit manufacturer.<br />

3.04 PROTECTION AND CLEANING<br />

A. Protect exterior glass from breakage immediately upon installation by use of crossed<br />

streamers attached to framing and held away from glass. Do not apply markers to surfaces of<br />

glass. Remove nonpermanent labels and clean surfaces.<br />

B. Protect glass from contact with contaminating substances resulting from construction<br />

operations. If, despite such protection, contaminating substances do come into contact with<br />

glass, remove immediately by method recommended by glass manufacturer.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

GLASS AND GLAZING 08800-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!