10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

effect unless the contractor notifies the owner in writing that alterations would reasonably cause a<br />

limitation or termination of the warranty.<br />

At the conclusion of the two (2) year warranty period, the contractor shall schedule a site<br />

visit to the project with the owner’s representative, the design architect/engineer and/or roofing<br />

consultant, and roofing materials manufacturer’s representative to inspect the roofing, base<br />

flashing, and associated work for damage and/or defects in materials and workmanship. At his own<br />

expense, the contractor shall promptly repair any damage and/or defects observed as directed by<br />

the design architect/engineer and/or roofing consultant and/or manufacturer’s representative, and<br />

as approved by the owner. Date and time of this inspection shall be made at a mutually convenient<br />

time to all parties.<br />

The roofing contractor shall be responsible to coordinate the requirements of this warranty with the<br />

provision of any and all other warranty(s), which may be separately furnished for this project.<br />

In witness whereof, _______________________________________________ a corporate officer<br />

of the roofing contractor being duly subscribed and sworn has caused this instrument to be signed<br />

and sealed this ____________ day of _____________________, ____________.<br />

Company: ____________________________________<br />

(Type name of Company)<br />

Title: ______________________________<br />

(Type)<br />

Signature: _____________________________<br />

Seal:<br />

(if a corporation)<br />

Notary Public:<br />

My Commission Expires:<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

BUILT-UP ASPHALT ROOFING 07511 - 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!