10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

other than specified in the Contract. The Contract cannot be amended or added to except by an<br />

Amendment or Purchase Order signed by the Owner's Authorized Representative. Any work<br />

performed without such an executed writing shall be presumed to have been included in the Contract<br />

without additional charge.<br />

2.11 STATEMENTS OF CONFIRMATION<br />

The contractor shall submit to the owner's representative, the following items:<br />

A. Submit, at the time of delivery, invoice statements for organic amendments and fertilizer certifying<br />

delivery to the site quantities by bulk and/or weight.<br />

B. Submit supplier's statements of confirmation recording compliance of organic amendments and<br />

fertilizers with these specifications.<br />

C. Submit certificates for the following items upon delivery to the job site:<br />

1) Quantity of commercial fertilizer and organic fertilizer.<br />

2) Quantity of soil amendments.<br />

3) Quantity of other soil additives per agronomic soils test report.<br />

4) Submit written certificate of container or bulk materials.<br />

5) Submit written certificate of quantity and quality of plant materials.<br />

3.01 SCOPE OF WORK<br />

A. Soil preparation and planting, per plan.<br />

3.02 MATERIALS<br />

A. General - all materials shall be best available.<br />

1) Submit color photographs 60 days prior to installation to the Landscape Architect and Owner's<br />

representative of specified trees, shrubs and vines taken at their sources, for approval. The<br />

photos shall be of the plant material to be delivered to the job site, and plant material delivered<br />

shall be of equal or better quality as the photo given as a representative sample.<br />

2) Do not begin soil preparation and planting until all work such as header installation, walks,<br />

paving, concrete work, electrical except for fixture location, fencing except where access is<br />

necessary, drainage work, gas line installation, irrigation work, and any other work required<br />

under plans and specifications around planting areas is completed and approved. Specimen<br />

trees twenty (20) inch, and larger box sizes or palm trees are exempt from this rule where<br />

access might be restricted by construction phases of landscaping or building. All plants and<br />

planting shall be continually maintained by the Landscape Contractor.<br />

B. Plant Material - All plants shall be healthy, of normal growth, well rooted, free from disease, insect<br />

eggs and larvae. The roots shall show no evidence of having been restricted, deformed or root<br />

bound at any time.<br />

1) Plants not conforming to the requirements specified, i.e.: rootbound, diseased, having pests,<br />

or planted in unacceptable soil mix, will be considered defective. Such plants, whether in<br />

place or not, will be marked as rejected and shall be immediately replaced at no cost (labor<br />

or materials) to client with new acceptable plants.<br />

2) Varieties and sizes of plants shall be as stated in the plant list or on the plans.<br />

3) Under no conditions will there be any substitution of plants or sizes for those listed on the<br />

accompanying plans, except with the express written consent of the Landscape Architect.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

LANDSCAPING 02900-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!