connecting. Motor rotations shall be made in the proper direction. Pump motors are not to<br />

be test run until liquid is in the system and proper lubrication to all bearings in unit is checked.<br />

B. Conduit, wire and circuit breaker sizes for mechanical, elevator and similar equipment are<br />

based on the equipment ratings of one manufacturer. The equipment actually furnished may<br />

have entirely different electrical characteristics. Conduit, wire, circuit breakers, disconnects,<br />

etc. shall not be ordered or installed until exact electrical requirements are obtained.<br />

Responsibility for this coordination rests with the Contractor.<br />

3.11 SEISMIC BRACING:<br />

A. Furnish and install all seismic bracing of equipment, feeders, lighting fixtures, and other<br />

electrical items in accordance with prevailing codes. Refer to ASCE 7-02, section 9.6 for<br />

calculation methods. Provide and submit the required designs, calculations, certifications,<br />

and stamped drawings to the authority having jurisdiction and obtain their approval prior to<br />

installation or fabrication.<br />

B. Where conduit, cable trays, or busducts are attached to structures where they cross a<br />

seismic isolation interface, the electrical components shall be designed to accommodate the<br />

seismic relative displacement.<br />

3.12 PAINTING:<br />

A. All electrical equipment and conduit exposed in finished areas and on exterior walls are to be<br />

painted to match surrounding surfaces.<br />

B. Contractor shall coordinate the timing of painting requirements.<br />

C. Refer to Architectural specifications for methods and materials.<br />

3.13 PROJECT RECORD DOCUMENTS:<br />

A. Maintenance of Documents:<br />

1. Maintain at Jobsite, One Record Copy of: Contract Drawings, <strong>Specification</strong>s,<br />

Addenda, Reviewed Shop Drawings, Change Orders, Other Modifications to Contract<br />

and Field Test Records.<br />

2. Keep apart from documents used for construction.<br />

3. Keep documents available at all times for inspection by Architect.<br />

B. Recording:<br />

1. Label each document "PROJECT RECORD."<br />

2. Keep record documents current. Do not permanently conceal any work until required<br />

information has been recorded.<br />

3. Contract Drawings, legibly mark to record actual construction; including but not<br />

limited to the following:<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

BASIC ELECTRICAL MATERIALS AND METHODS 16050-10