access with minimum number of offsets in tray runs. If during construction as built conditions<br />

occur, such that cable tray becomes inaccessible for any reason, Division 16 contractors<br />

shall submit immediately to the architect:<br />

1. The type and location of the obstruction including the trades involved.<br />

2. The means proposed by Division 16 contractor to maintain accessibility.<br />

Contractor shall proceed only if his proposal is approved. If the Contractor proceeds without<br />

approval, the cable tray shall be relocated as directed by architect at contractors expense.<br />

B. Install all cable tray in an accessible and visible-from-floor location. Provide a diagonal<br />

seismic restraint brace at maximum 15 foot intervals.<br />

C. Install tray and all accessories to provide electrical continuity throughout system. Provide flat<br />

braided aluminum straps at questionable grounding connections.<br />

D. Hanger rods shall be fastened to structure in an approved manner. Pullout resistance shall<br />

have a safety factor of 4.<br />

E. Follow manufacturer's instructions and details for separation of dissimilar metals including<br />

steel suspension rod to aluminum splice connectors or cable tray. Provide nylon bushings at<br />

joints, vinyl sleeve at hanger rods.<br />

F. Maintain a minimum 12" spacing from light fixtures and electrical conduits. Maintain a 40"<br />

spacing from electric motors. Coordinate tray location with conduit layout and motor<br />

locations.<br />

G. Provide at all penetrations a permanent fire stop system. The system shall consist of<br />

reusable heat expanding pillows or bags. The fire stop material shall be approved by Factory<br />

Mutual System and shall be Underwriters Laboratories classified. The penetration seal<br />

method and material shall have an Underwriters Laboratories fire rating equal to the wall or<br />

floor in which the openings are located. The penetration seal must allow future changes,<br />

such as addition or removal of cables, with no damage to the integrity of the seal. If the wall<br />

or floor penetration is for cable tray passage, the fire stop material shall have been tested by<br />

Underwriters Laboratories for use with both steel and/or aluminum cable tray. The seal<br />

method shall provide an immediate seal with no cure time. The penetration seal must be<br />

unaffected by atmospheric conditions, water exposure or constant high humidity. The fire<br />

seal shall be installed strictly according to the manufacturer/distributor published instructions.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

CABLE TRAY 16115-3