including related specification section and drawing number(s), and fully documented to show<br />

compliance with requirements for substitutions.<br />

B. Include product data/drawings, description of methods, samples where applicable,<br />

Contractor's detailed comparison of significant qualities between specified item and proposed<br />

substitution, statement of effect on construction time and coordination with other affected<br />

work, cost information or proposal.<br />

C. All proposed substitutions must be submitted to Owner for review.<br />

PART 2 - PRODUCTS<br />

2.01 GENERAL PRODUCT COMPLIANCE<br />

A. Procedures for Selecting Products: Contractor's options for selecting products are limited by<br />

Contract Document requirements and governing regulations, and are not controlled by<br />

industry traditions or procedures experienced by Contractor on previous construction projects.<br />

B. Visual Matching: Where matching with an established sample is required, final judgment of<br />

whether a product proposed by Contractor matches sample satisfactorily is Architect's<br />

judgment.<br />

C. Visual Selection: Except as otherwise indicated, where specified product requirements include<br />

"... as selected from manufacturer's colors, patterns, textures..." or words of similar effect, the<br />

selection of manufacturer and basic product (complying with requirements) is Contractor's<br />

option, and subsequent selection of color, pattern, and texture is Architect's selection.<br />

D. Products that include a color, pattern and texture selection have, in many cases, been<br />

selected and approved by the Owner. Where specification sections designate a specific<br />

manufacturer’s product, and the specification also allows other manufacturers to provide<br />

products subject to compliance with requirements of that section, the color(s), texture(s) and<br />

pattern(s) of the specified product also constitute requirements that must be met. Other<br />

products may be incorporated in the project provided they meet the design intent of the<br />

specified product including the color(s), texture(s) and pattern(s) of that product. Compliance<br />

with the design intent shall be determined by the Architect subject to the Owner’s approval.<br />

Any product or material not submitted prior to the bid as a proposed substitution, or submitted<br />

as a proposed substitution, but not receiving approval, may be submitted after the bid during<br />

the submittal process, but is done so with the risk of rejection. Should a product be rejected,<br />

then the Contractor shall provide the product specified at no additional cost to the Owner and<br />

with no change in the Contract Time.<br />

1. The intent of this paragraph is not to restrict competitive bidding nor to exclude<br />

manufacturers that offer products of equal or better quality than those specified, but to<br />

meet the design aesthetic and intent that has been approved by the Owner. The<br />

decision to approve or reject an alternate product will be based upon how closely the<br />

proposed alternate(s) matches the color(s), texture(s) and pattern(s) of the specified<br />

products, and also the combined appearance of all products together. Minor<br />

variations in appearance will be allowed, however, the Architect and the Owner are<br />

the sole judges of what constitutes a minor variation.<br />

2.02 SUBSTITUTIONS<br />

A. Conditions: Contractor's request for substitution will be received and considered when<br />

extensive revisions to Contract Documents are not required, and changes are in keeping with<br />

general intent of Contract Documents; when timely, fully documented and properly submitted;<br />

and when one or more of the following conditions is satisfied, all as judged by Architect.<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

PRODUCTS AND SUBSTITUTIONS 01100 - 2