talk, and other impairments. Provide 5-ohm ground at main equipment location. Measure,<br />

record, and report ground resistance.<br />

C. The contractor shall provide all necessary transient protection on the AC power feed and on<br />

all station lines leaving or entering the building.<br />

D. The contractor shall note in his system drawings, the type and location of these protection<br />

devices as well as all wiring information.<br />

E. The contractor shall furnish and install a dedicated, isolated earth ground from. the central<br />

equipment rack and bond to the incoming electrical service ground buss bar.<br />

3.4 FIELD QUALITY CONTROL<br />

A. MANUFACTURER’S FIELD SERVICES:<br />

1. Provide services of a duly factory authorized service representative for this project<br />

location to supervise the field assembly and connection of components and the pretesting,<br />

testing, and adjustment of the system.<br />

B. INSPECTION:<br />

1. Make observations to verify that units and controls are properly labeled, and<br />

interconnecting wires and terminals are identified. Provide a list of final tap settings<br />

of paging speaker line matching transformers.<br />

C. TESTING:<br />

3.5 COMMISSIONING:<br />

1. Rectify deficiencies indicated by tests and completely re-test work affected by such<br />

deficiencies at Contractor's expense. Verify by the system test that the total system<br />

meets the <strong>Specification</strong>s and complies with applicable standards.<br />

A. Train Owner's maintenance personnel in the procedures and schedules involved in operating,<br />

troubleshooting, servicing, and preventative maintenance of the system. Provide a minimum<br />

of ten (10) hours training. O&M’s and Users Guides to be provided at the time of this training.<br />

B. Schedule training with Owner through the Architect, with at least seven days advance notice<br />

3.6 OCCUPANCY ADJUSTMENTS:<br />

A. When requested by the Architect within one year of date of Substantial Completion, provide<br />

on-site assistance in adjusting sound levels, resetting matching transformer taps, and<br />

adjusting controls to suit actual occupied conditions. Provide up to three (3) visits to the site<br />

for this purpose.<br />

3.7 CLEANING AND PROTECTION:<br />

A. Prior to final acceptance, clean system components and protect from damage and<br />

deterioration.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

INTEGRATED ELECTRONIC COMMUNICATION NETWORK 16760-14