10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(1) All costs resulting from modifications to the structure, substrates<br />

and/or other components as required by the proposed substitution.<br />

Each and every cost shall be clearly delineated in the submittal.<br />

B. Post-bid submittals:<br />

1. Shop Drawings: Submit CAD generated shop drawings showing profiles of panel units,<br />

details of forming, joint supports, anchorages, trim, flashings, sealants and accessories.<br />

Show details of weatherproofing at edge terminations, show elevations, and layout of<br />

entire work.<br />

a. Shop drawings should indicate project layout from control gird lines and<br />

elevations referring to the required details for each unique condition.<br />

b. The details should show the preferred profiles and performance requirements.<br />

Provide a watertight and structurally sound, self-draining wall panel system<br />

that meets or exceeds the performance criteria set in the Testing Section 1.05.<br />

2. Samples: Submit an 8" x 8" sample of panel system in the specified finish complete<br />

with factory applied edge treatment, fabricated into units representative of the actual<br />

system.<br />

3. Test Reports: Submit certified test reports which meet or exceed the requirements as<br />

described in the Testing Section 1.05. The test report shall include the following,<br />

a. Name and location of the certified independent testing laboratory with the<br />

contact phone numbers.<br />

b. Date the test was performed.<br />

c. Unit description and system name of the panel system tested. Include the test<br />

drawings with elevations with details showing the tested panel joinery.<br />

4. Report of Approval: ICC/EC Evaluation Report No. ESR-1114.<br />

5. Affidavit: Certifying material meets requirements specified.<br />

1.04 QUALITY ASSURANCE<br />

A. Qualifications:<br />

1. Installer qualifications: Installer experienced in performing work of this section who has<br />

experience in wall applications similar to that required for this project.<br />

a. Installation History: Installer shall be a firm that has at least five (5) years of<br />

experience with exterior wall applications and has successfully completed<br />

installations of similar scope and size to this project.<br />

2. Fabricator Qualifications: Fabricator capable of providing field service representation<br />

during construction, approving acceptable installer and application method.<br />

a. Fabrication History: Panel fabricator shall assume undivided responsibility for<br />

all components of the panel work, and shall demonstrate no less than ten (10)<br />

years successful experience of metal panel work similar in scope and size to<br />

this project.<br />

3. Manufacturer Qualifications: Manufacturer experienced in performing work of this<br />

section that has experience with the specified materials.<br />

a. Manufacturer of the composite material must have at least ten (10) years<br />

experience in the production of the specified composite material.<br />

b. ICC/EC Report: Composite panel manufacturer shall have an ICC/EC<br />

Research Report (i.e., Report ESR-1114 for Alucobond PE Core ! ).<br />

c. Certification: Composite panel manufacturer shall have established a<br />

Certification Program acceptable to the local Code Authorities.<br />

d. Manufacturers of the accessories and perimeter framing extrusions must have<br />

at least five (5) years experience in the production of their respective products.<br />

________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

COMPOSITE PANELS 07430 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!