covered by these specifications.<br />

Should the drawings conflict with the code, the code shall govern the proper installation of the work, and no extra<br />

charge shall be made for the proper installation.<br />

Should the contractor perform any work that does not comply with the requirements of the applicable building<br />

codes, state laws, local ordinances, industry standards, or utility company regulations, he shall bear all costs<br />

associated with correcting the deficiencies.<br />

Where the work required by the drawings and specifications exceeds the minimum code requirements, the work<br />

shall be done as shown or specified.<br />

NOTE: Code compliance, or similar terminology, shall be interpreted to mean "the interpretation of the code as<br />

enforced by the local building authority".<br />

DRAWINGS AND SPECIFICATIONS:<br />

These specifications are intended to cover all labor, material, and standards of mechanical workmanship to be<br />

employed in the work shown on the drawings, called for in these specifications, or reasonably implied by terms<br />

of same.<br />

The drawings and specifications are intended to supplement one another, and any part of the work that may be<br />

mentioned in the one and not represented in the other shall be done the same as if it had been mentioned or<br />

represented in both.<br />

Large scale drawings shall take precedence over layouts and small scale details.<br />

The mechanical drawings are schematic in nature. They show the general arrangement of all piping, ductwork,<br />

mechanical equipment, and appurtenances. They shall be followed as closely as the actual building<br />

construction and the work of other trades will permit.<br />

Due to tight structural conditions and space limitations in selected areas the contractor should anticipate<br />

structural and space conflicts, and shall make allowances for them in his bid. Until the steel fabrication shop<br />

drawings are submitted for review, the mechanical coordination cannot be completed.<br />

Because of the small scale of the mechanical drawings, it is not possible to indicate all offsets, fittings, and<br />

accessories which will actually be required. This contractor shall investigate the structural and finish conditions<br />

affecting the work and provide all necessary offsets, fittings, valves, trim and accessories required to meet actual<br />

job-site conditions.<br />

a. Dimensions -<br />

Verify dimensions governing mechanical work at the building. No extra compensation shall be claimed<br />

or allowed on account of differences between the actual job-site dimensions and those indicated on the<br />

drawings.<br />

b. Adjoining work -<br />

Examine all adjoining work on which the mechanical work is dependent and report any work which must<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-2