Instrumentation List:<br />

A list of instruments by type and make used in gathering the CAB data.<br />

Drawings:<br />

The CAB contractor's working drawings shall have the VAV, and fan powered boxes and supply air openings<br />

numbered and/or lettered to correspond to the numbers and letters used on the report data sheets so that data<br />

in the report can be correlated with each specific supply air opening in the building. If room numbers actually<br />

used in the building differ from those on the plans, the building room numbers shall be marked on these plans.<br />

Only one such marked-up set of drawings need be provided with the six copies of the CAB report.<br />

Before final acceptance of the CAB report, the report data, at the discretion of the Owner's representative, shall<br />

be verified one time on the job site, by selection of check points (not to exceed 10 percent of total) at random, in<br />

the presence of the Owner's representative. Representatives of the testing firm doing the work shall be present<br />

and provide the necessary equipment for test data verification.<br />

The firm shall be responsible for inspecting, adjusting, balancing, and logging the data on the performance of<br />

fans, all dampers in the duct system, all air distribution devices, the flows of freon or water thru all coils, and the<br />

power consumption of all motors.<br />

During the CAB work, the temperature regulation will be adjusted for proper relationship between controlling<br />

instruments. The Owner's representative will be advised of any instruments out of calibration so that the controls<br />

subcontractor may come in and recalibrate, using data supplied by the balancing firm.<br />

Make a total of three inspections within ninety (90) days after occupancy of the building to insure that satisfactory<br />

conditions are being maintained throughout and to satisfy and unusual conditions.<br />

An additional inspection in the building shall be made by the firm during the season opposite that in which the<br />

initial adjustments were made. At that time, any necessary modifications to the initial adjustment required to<br />

produce optimum operation of the system components shall be made to produce the proper seasonal conditions<br />

in each conditioned space.<br />

At the time of opposite season checkout, the Owner's representative shall be given timely notification before any<br />

readings or adjustments are made so that they may participate in the checkout.<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

BALANCING 15043-5