10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Copper Piping in Domestic Water Service: Piping shall be cut (with a pipe cutter) so ends are square and will<br />

"bottom" in fittings. There must be no gaps left thru which solder can run into the line. If a hack saw must be<br />

used, it shall be guided with a miter box to insure a square, even cut. Tubing shall be reamed to remove burrs,<br />

being careful not to expand tubing while reaming.<br />

The outside of the copper pipe and the inside of the fittings, where solder will be applied, shall be burnished with<br />

fine crocus cloth or fittings brushes until all dirt and oxide is removed.<br />

A light coat of soldering flux shall be applied to both pipe and fittings. Acid flux shall not be used.<br />

Joints in copper pipe shall be uniformly heated to proper soldering temperature to insure that solder will flow to<br />

all parts of the joint. The solder shall be fed to the joint until a uniform line of solder appears around the pipe at<br />

the end of the fittings.<br />

Copper piping used in domestic water service above grade shall be joined with 'Stay-Safe-50' or 'Silvabrite-100'<br />

no lead solder.<br />

Copper piping used in domestic water service below grade shall have brazed -or- silver soldered joints.<br />

When valves are being installed in copper piping, the non-metallic parts shall be removed to prevent the heat of<br />

soldering from damaging the valves. No heat shall be applied near where an excessive temperature may cause<br />

damage.<br />

Refrigeration piping: See "Refrigeration Piping Installation."<br />

Victaulic type couplings, fittings, and valves may be used for chilled water piping 2" and over when fabricated<br />

and installed in strict compliance with the manufacturer's recommendations.<br />

Qualification of Welders: Welders performing work under this Contract shall be certified and qualified in<br />

accordance with tests prescribed by the National Certified Welding Bureau (NCWB) or by other approved test<br />

procedures using methodology and procedures covered in the ASME Boiler and Pressure Vessel Code, Section<br />

IX, "Qualification Standard for Welding and Brazing Procedures, Welders, Braziers, and Welding and Brazing<br />

Operators."<br />

Submit for approval the names, identification, and welder's assigned number, letter or symbol of welders<br />

assigned to this project.<br />

The assigned identification symbol shall be used to identify the work of each welder and shall be indelibly<br />

stamped immediately upon completion of each weld.<br />

Welders shall be tested and certified for all positions.<br />

Submit identifying stenciled test coupons made by each operator.<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!