10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VALVE IDENTIFICATION CHART<br />

NUMBER DESCRIPTION LOCATION NORMAL<br />

POSITION<br />

1. Cold Water Supply to Water Heater Mech. Room #121 Open<br />

2. Cold Water Supply to Hose Room #13 Open<br />

3. Cold Water Supply to Equip. in Room<br />

#12<br />

Room #18 Open<br />

4. Sprinkling System Drain Valve Tunnel Below Room #115 Closed<br />

5. Hot Water Supply to Toilet Room<br />

#212<br />

6. Air Vents - Cooling Coil #12 (2<br />

required)<br />

7. Heating Hot Water Balancing Valve<br />

(Southwest Zone)<br />

Mechanical Equipment & Ductwork:<br />

Chase #210 Open<br />

Fan Room 3122 Closed<br />

Above Ceiling Room #412 Marked On<br />

Valve<br />

All mechanical equipment, including meters, fans, pumps, relocated equipment, and other devices shall be<br />

identified with signs made of laminated plastic 1/8" or larger engraved letters. Signs shall be securely attached<br />

by rustproof screws or some other permanent means (no adhesives).<br />

Information on sign shall include name of equipment, rating, maintenance instructions, and any other important<br />

data not included on factory attached nameplate.<br />

Signs shall be attached to equipment so they can be easily read.<br />

Identify all ducts exposed in mechanical equipment rooms and in ducts and pipe chases. Sample duct<br />

identification shall be as follows:<br />

"Cold Duct - High Pressure - To Second Floor System"<br />

"Exhaust Duct - Toilet Room - To EF-3"<br />

"Ventilation Air Duct - To Utility Room #228"<br />

Ducts shall be labeled at all wall penetrations and at connections to equipment.<br />

PAINTING:<br />

Mechanical Contractor: All equipment which is to be furnished in factory prefinished conditions by the<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!