30. Automatic temperature controls<br />

31. Air balance contractor qualifications<br />

32. System commissioning contractor's qualifications<br />

33. Fire-safing materials and methods<br />

34. Other schedule items<br />

Submittals received which do not contain all of the above items will be returned unchecked.<br />

Purpose and Contractor's Responsibility:<br />

The purpose of the final submittal is to "assist the contractor selecting the equipment." The contractor shall<br />

review the submittals prior to submission to the Owner's representative to make sure that the submittals are<br />

complete in all details including the following items:<br />

1. Manufacturers' names shall be mentioned in specifications as accepted by Owner at time of bidding.<br />

2. Equipment dimensions shall be verified to fit the spaces provided with sufficient clearances, as may be<br />

required by the equipment or indicated on the drawings.<br />

3. Equipment shall be reviewed with respect to schedules, specifications, plans and details.<br />

4. Equipment submittal sheets shall be clearly marked indicating equipment symbol and exact selection of<br />

proposed equipment.<br />

Review:<br />

Review and acceptance of submittal does not relieve the contractor of his responsibility to fulfill the contract<br />

requirements. Review and acceptance of the submittal will not be used as a means of changing the contract<br />

requirements. Items not covered in the accepted submittal, or items incorrectly covered but not recognized or<br />

identified, shall not be used when contrary to the requirements of the contract documents.<br />

Acceptance of Substitute Equipment:<br />

If the proposed equipment is approved, this contractor shall make all incidental changes in piping, ductwork,<br />

supports, installation, wiring, heaters, panel boards, and as otherwise necessary. Provide any additional motors,<br />

valves, controllers, fittings, and other additional equipment required for the proper operation of the system<br />

resulting from the contractor's selection of alternate equipment, including all required changes in the effected<br />

trades.<br />

Owner's Refusal Right:<br />

In the event that items submitted are substitutions for specified items and are found to be not acceptable, the<br />

right shall be reserved to require the specified items.<br />

OPERATING INSTRUCTIONS AND CATALOG INFORMATION:<br />

This contractor shall compile in looseleaf binders catalogs of every product used by him in the completion of the<br />

work. The binders shall also include copies of the test data (Section 15042), balancing reports (Section 15043),<br />

and system commissioning data (Section 15030). Before final acceptance by the Owner's representative, he<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-8