10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 02008 – WATER UTILITY PIPING<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

A. Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 1 Summary of Work Sections, apply to this Section.<br />

B. Codes and Standards:<br />

1. Plumbing Code Compliance: Comply with applicable portions of National Standard<br />

Plumbing Code pertaining to selection and installation of potable water system materials<br />

and products.<br />

2. Water Purveyor Compliance: Comply with requirements of Purveyor supplying water to<br />

project, obtain required permits and inspections.<br />

3. NFPA Compliance: Install fire water systems in accordance with NFPA 24 "Standard for<br />

Installation of Private Fire Service Mains and Their Appurtenances".<br />

4. Local Fire Department/Marshall Regulations: Comply with governing regulations<br />

pertaining to hydrants, including hose unit threading and similar matching of connections.<br />

5. UL Compliance: Provide fire hydrants that comply with UL 246 "Hydrants for<br />

Fire-Protection Service", and are listed by UL.<br />

1.2 SUMMARY<br />

A. This Section includes pressure water pipes and fire systems outside the building, with the<br />

following components:<br />

1. Special fittings for expansion and deflection.<br />

2. Pipes and valves.<br />

3. Fire Hydrants.<br />

1.3 DEFINITIONS<br />

A. PVC: Polyvinyl chloride plastic.<br />

B. DI: Ductile Iron pressure pipe.<br />

1.4 PERFORMANCE REQUIREMENTS<br />

A. Pressure Rating: 175 psi static water pressure for all pipes and fittings. Pipe joints shall be<br />

water tight.<br />

1.5 SUBMITTALS<br />

A. Product Data: For the following:<br />

1. Special pipe fittings.<br />

2. Fire hydrants<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

WATER UTILITY PIPING 02008 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!