No piping or valve assemblies shall be run exposed in a finished area without the prior approval of the owner's<br />

representative.<br />

JOB CLOSEOUT:<br />

This contractor shall assure that all placards, signs, and instruction manuals are in place, and all tests are run<br />

before any consideration for final payment will be considered. This includes maintenance manuals, hydraulic<br />

calculations placards, spare head cabinets and the proper number of spare heads, and instruction to on-site<br />

personnel.<br />

This contractor shall, in addition to the above, furnish the owner one (1) set of mylar reproducibles of the<br />

sprinkler system "record drawings" for his project files.<br />

_______________________________________<br />

_______________________________________________________________________________________<br />

______<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

FIRE PROTECTION 15500-6