10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

e corrected. No waiver of responsibility shall be claimed or allowed due to failure to report unfavorable<br />

conditions affecting the mechanical work.<br />

The structural drawings shall be considered part of the mechanical work insofar as these drawings furnish this<br />

Division with information relating to design and construction of the building.<br />

Structural drawings take precedence over the general building layouts and details shown on the mechanical<br />

drawings.<br />

The structural engineer shall approve all attachments to or modifications of any structural members in the<br />

building required for installation of the mechanical systems.<br />

INTERPRETATION OF DRAWINGS AND DOCUMENTS:<br />

If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any<br />

part of the plans, specifications, or other proposed contract documents, or finds discrepancies in or omissions<br />

from the drawings or specifications, he may submit to the Owner's representative, a written request for an<br />

interpretation or correction thereof. The person submitting the request will be responsible for its prompt delivery.<br />

Any interpretation or correction of the proposed documents will be made only by addenda duly issued, and a<br />

copy of such addenda will be mailed or delivered to each person receiving a set of such documents. The Owner<br />

will not be responsible for any other explanations or interpretations of the proposed documents. All questions<br />

shall be submitted at least seven days in advance of bidding.<br />

The Owner's representative will interpret the meaning of any part of the drawings and specifications about which<br />

any misunderstanding may arise, and his decisions will be final. Should there appear to be any error or<br />

discrepancy in or between the drawings and specifications, the contractor shall refer the matter to the Owner's<br />

representative for adjustment before proceeding with the work. Should the contractor proceed with the work<br />

without so referring the matter, he does so on his own responsibility.<br />

WORKMANSHIP:<br />

Workmanship shall be the best quality of its kind for the respective industries, trades, crafts, and practices, and<br />

shall be acceptable in every respect to the Owner's representative.<br />

SUBSTITUTIONS:<br />

See Special Conditions pertaining to Substitutions.<br />

FEES & PERMITS:<br />

All necessary permits and fees required in connection with the work will be paid by the school district.<br />

SITE INSPECTION AND EXAMINATION OF DRAWINGS:<br />

The contractor shall carefully study all drawings and specifications pertaining to the work. If any of the work as<br />

laid out, indicated, or specified is contrary to or conflicts with any governing ordinances or regulations, the same<br />

shall be reported to the Owner's representative before submitting a bid. The Owner's representative will then<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!