3.2 DEVICE LOCATION<br />

A. Install smoke and heat detectors a minimum of 3 feet away from air supply and return<br />

diffusers. Install smoke or heat detectors in sloped ceilings to within 3 feet of the top of the<br />

sloped structure.<br />

B. Install smoke and heat detectors in locations as approved by the NFPA 72. Adjust locations<br />

as required to coordinate with solid beam construction, peaked or sloped ceilings, and high<br />

ceiling areas.<br />

C. Smoke detectors installed in corridors shall be no more than 30 feet on center, and 15 feet<br />

from the end of the hallway. Pullstations shall be located not more than 15 feet from end of<br />

the hallway. Strobes and speaker/strobes shall not be located more than 15 feet from the end<br />

of a hallway or change in corridor direction.<br />

D. Consult Engineer for minor relocations of devices that may be required to avoid obstructions,<br />

or for ease of installation or concealment. Mark all such relocations on record drawings.<br />

Contractor shall relocate devices up to 15 feet without any additional charge to the contract.<br />

3.3 FIELD QUALITY CONTROL:<br />

A. A factory trained representative of the manufacturer shall supervise the prefinal testing of the<br />

system. Pretest all installed devices to ensure compliance prior to the final test.<br />

B. The final test shall be subject to the approval and acceptance of the responsible<br />

Architect/Engineer, and the Fire Marshal. Provide all appropriate equipment to complete the<br />

testing.<br />

C. On completion of the acceptance tests, the Owner or his representative shall be instructed in<br />

the operation and testing of the system.<br />

3.4 CERTIFICATION/CLOSEOUT:<br />

A. Submit a statement to the Architect/Engineer that indicates the system has been designed,<br />

tested, and installed in accordance with all applicable codes and regulations.<br />

B. Submit diskette or CD, with all appropriate programming updates to the owner.<br />

C. Submit testing report to the Architect/Engineer and Fire Marshal showing results of tests.<br />

D. Submit letter of warranty, guaranteeing the new portion of the fire alarm system for 3 years.<br />

Provide a 4 hour response upon failure of any component of the fire alarm system. The<br />

vendor, and the contractor, are required to participate as necessary for any warranty work<br />

during the warranty period.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

FIRE ALARM SYSTEMS 16723-10