- Page 1 and 2: SL&A ARCHITECTS A R C H I T E C T U
- Page 3 and 4: DIVISION 4 - MASONRY Section 04200
- Page 5: Section 16740 - Telephone and Data
- Page 9 and 10: SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 11 and 12: project using the most expensive me
- Page 13 and 14: SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 15 and 16: COMPLETION DATE: The project comple
- Page 17 and 18: SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 19 and 20: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ENERGY-
- Page 21 and 22: 12. Snow Removal from Access Roads
- Page 23 and 24: SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 25 and 26: SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 27 and 28: In such proposals, profit and overh
- Page 29 and 30: the Owners as required by the Prope
- Page 32 and 33: SECTION 01010 - SUMMARY OF WORK PAR
- Page 34 and 35: SECTION 01030 - ALTERNATES PART 1 -
- Page 36 and 37: SECTION 01035 - MODIFICATION PROCED
- Page 38 and 39: SECTION 01040 - PROJECT COORDINATIO
- Page 40 and 41: necessity of uncovering completed c
- Page 42 and 43: SECTION 01050 - FIELD ENGINEERING P
- Page 44 and 45: SECTION 01090 - DEFINITIONS AND STA
- Page 46 and 47: SECTION 01100 - PRODUCTS AND SUBSTI
- Page 48 and 49: 1. Where required product, material
- Page 50 and 51: SECTION 01155 - APPLICATIONS FOR PA
- Page 52 and 53: covered by the previous application
- Page 54 and 55: SECTION 01200 - PROJECT MEETINGS PA
- Page 56 and 57:
SECTION 01300 - SUBMITTALS PART 1 -
- Page 58 and 59:
eproducible media, of sufficient wi
- Page 60 and 61:
2. Do not submit Product Data until
- Page 62 and 63:
SECTION 01400 - TESTING AND LABORAT
- Page 64 and 65:
SECTION 01500 - CONSTRUCTION FACILI
- Page 66 and 67:
SECTION 01700 - CONTRACT CLOSEOUT P
- Page 68 and 69:
j. Clean transparent materials, inc
- Page 70 and 71:
SECTION 01731 - CUTTING AND PATCHIN
- Page 72 and 73:
B. Protection: Protect existing con
- Page 74 and 75:
SECTION 01740 - WARRANTIES AND BOND
- Page 76 and 77:
SECTION 01782 - OPERATION AND MAINT
- Page 78 and 79:
tab to indicate contents. Include t
- Page 80 and 81:
maintenance procedures: 1. Test and
- Page 82:
DIVISION 2 - SITEWORK Section 02001
- Page 85 and 86:
B. If specified precautions are not
- Page 87 and 88:
1.5 SUBMITTALS A. Photographs or vi
- Page 89 and 90:
1. Arrange with utility companies t
- Page 91 and 92:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 93 and 94:
2. 12 inches (300 mm) outside of co
- Page 95 and 96:
1.7 PROJECT CONDITIONS A. Existing
- Page 97 and 98:
B. Preparation of subgrade for eart
- Page 99 and 100:
B. Excavate trenches to uniform wid
- Page 101 and 102:
1. Carefully compact initial backfi
- Page 103 and 104:
materials and compact simultaneousl
- Page 105 and 106:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 107 and 108:
1. Videotape: Show existing conditi
- Page 109 and 110:
B. Shop Drawings: Indicate pavement
- Page 111 and 112:
B. Prime Coat: Not required if pavi
- Page 113 and 114:
G. Verify that utilities, traffic l
- Page 115 and 116:
3.6 JOINTS A. Construct joints to e
- Page 117 and 118:
3.11 WHEEL STOPS A. Securely attach
- Page 119 and 120:
1. Aggregates. Include service reco
- Page 121 and 122:
2.3 STEEL REINFORCEMENT A. Plain-St
- Page 123 and 124:
E. Epoxy Bonding Adhesive: ASTM C 8
- Page 125 and 126:
PART 3 - EXECUTION 3.1 EXAMINATION
- Page 127 and 128:
1. Grooved Joints: Form contraction
- Page 129 and 130:
3.7 FLOAT FINISHING A. General: Do
- Page 131 and 132:
E. Curing Methods: Cure concrete by
- Page 133 and 134:
G. Remove and replace concrete pave
- Page 135 and 136:
E. Concrete for mow strip: 3000 psi
- Page 137 and 138:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 139 and 140:
3. Valves. 4. Valve boxes and appur
- Page 141 and 142:
B. Check Valves: UL-listed, 175 psi
- Page 143 and 144:
1. Ductile Iron Pipe: Install in ac
- Page 145 and 146:
3.11 ADJUSTING AND CLEANING A. Flus
- Page 147 and 148:
2. Catch Basins and Stormwater Inle
- Page 149 and 150:
2.5 CONCRETE PIPE AND FITTINGS A. P
- Page 151 and 152:
5. Adjusting Rings: Interlocking ri
- Page 153 and 154:
1. Grate Free Area: Approximately 5
- Page 155 and 156:
10. NPS 4 and NPS 6 (DN 100 and DN
- Page 157 and 158:
1. Install piping pitched down in d
- Page 159 and 160:
3.6 CLEANOUT INSTALLATION A. Instal
- Page 161 and 162:
3.14 CLOSING ABANDONED STORM DRAINA
- Page 163 and 164:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 165 and 166:
PART 2 - PRODUCTS 2.1 MANUFACTURERS
- Page 167 and 168:
2.7 DRAINAGE CONDUITS A. Molded-She
- Page 169 and 170:
c. Permittivity: 0.2 per second, mi
- Page 171 and 172:
PART 3 - EXECUTION 3.1 EXAMINATION
- Page 173 and 174:
B. Use increasers, reducers, and co
- Page 175 and 176:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 177 and 178:
E. Damage: Promptly repair damage c
- Page 179 and 180:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 181 and 182:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 183 and 184:
D. Profile Drawings: Show system pi
- Page 185 and 186:
4. For Dissimilar Pipes: ASTM D 592
- Page 187 and 188:
3. Place new pipe stub at line and
- Page 189 and 190:
4. Notify engineer of clearance pro
- Page 191 and 192:
B. Abandoned Manholes and Structure
- Page 193 and 194:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 195 and 196:
PART 3 BURIED PIPING 5. Pipework sh
- Page 197 and 198:
PART 7 POTABLE WATER LINES 1. Water
- Page 199 and 200:
threaded ends of the pipe. Screwed-
- Page 201 and 202:
PART 22 TESTING any other material
- Page 203 and 204:
2. Pipe and fittings shall be cut g
- Page 205 and 206:
PART 30 LINING without backing ring
- Page 207 and 208:
4. Copper pipe connected to ferrous
- Page 209 and 210:
A. Rubber hose shall be furnished a
- Page 211 and 212:
shall be placed flush with finish g
- Page 213 and 214:
! THIS PAGE LEFT INTENTIONALLY BLAN
- Page 215 and 216:
1. Ductile Iron Pipe: AWWA C151, wi
- Page 217 and 218:
D. Operating Tests: Open and close
- Page 219 and 220:
1.04 SUBMITTALS A. Material List: 1
- Page 221 and 222:
1.06 SUBSTITUTIONS A. If the Contra
- Page 223 and 224:
2) Fittings: wrought copper, solder
- Page 225 and 226:
B. Exercise extreme care in excavat
- Page 227 and 228:
G. Electric Control Valves: 1) Inst
- Page 229 and 230:
3.09 FINAL SITE OBSERVATION PRIOR T
- Page 231 and 232:
C. Accessories: 1. Reinforced wire:
- Page 233 and 234:
SPECIAL CONDITIONS 2.01 PERMITS AND
- Page 235 and 236:
other than specified in the Contrac
- Page 237 and 238:
D. Backfill A. The backfill recomme
- Page 239 and 240:
take 6" below top of shrub. Use gre
- Page 241 and 242:
May 70-80 Gallons Per Day June 90-1
- Page 244 and 245:
SECTION 03300 - CONCRETE WORK PART
- Page 246 and 247:
A. Portland Cement: ASTM C150 1. Ty
- Page 248 and 249:
2) "SBR Latex," Euclid Chemical Co.
- Page 250 and 251:
work. C. Fabricate forms for easy r
- Page 252 and 253:
several layers, place each layer wh
- Page 254 and 255:
temperatures. In hot, dry, and wind
- Page 256 and 257:
and bolts, down to solid concrete,
- Page 258 and 259:
F. Additional Tests: The testing se
- Page 260:
DIVISION 4 - MASONRY Section 04200
- Page 263 and 264:
installation. C. All tests shall be
- Page 265 and 266:
B. Mortar for Hollow Brick: 1. Type
- Page 267 and 268:
shown. Fill cells with reinforcing
- Page 269 and 270:
A. Clean masonry with an acid compo
- Page 272 and 273:
SECTION 05120 - STRUCTURAL STEEL PA
- Page 274 and 275:
F. Headed Stud Anchors: ASTM A 108,
- Page 276 and 277:
concrete, and Division 4 for masonr
- Page 278 and 279:
SECTION 05200 - STEEL JOIST AND JOI
- Page 280 and 281:
adjacent construction, complying wi
- Page 282 and 283:
SECTION 05300 - STEEL DECK PART 1 -
- Page 284 and 285:
D. Metal Closure Strips: Fabricate
- Page 286 and 287:
SECTION 05400 - COLD-FORMED METAL F
- Page 288 and 289:
B. Materials and Finishes: 1. For 1
- Page 290 and 291:
or partitions are indicated to supp
- Page 292 and 293:
SECTION 05500 - METAL FABRICATIONS
- Page 294 and 295:
1. General: Provide zinc-coated fas
- Page 296 and 297:
H. Prime coat exterior and interior
- Page 298 and 299:
B. Fill bollards solidly with concr
- Page 300 and 301:
SECTION 05810 - EXPANSION JOINT SYS
- Page 302 and 303:
2.05 FABRICATION 1. Base and frame
- Page 304:
DIVISION 6 - WOOD Section 06100 - R
- Page 307 and 308:
1.04 QUALITY ASSURANCE A. Single-So
- Page 309 and 310:
B. Galvanized Steel Sheet: Steel sh
- Page 311 and 312:
SEGP LILY ELEMENTARY SCHOOL CLASSRO
- Page 313 and 314:
1.07 JOB CONDITIONS A. Humidity and
- Page 315 and 316:
2.04 CABINET HARDWARE 3. Structural
- Page 317 and 318:
a. Edging is 3mm PVC. 8. Adjustable
- Page 319 and 320:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 322 and 323:
SECTION 07210 - BUILDING INSULATION
- Page 324 and 325:
A. Comply with manufacturer's instr
- Page 326 and 327:
SECTION 07240 - EXTERIOR INSULATION
- Page 328 and 329:
3.05 FINISH mesh around edges and c
- Page 330 and 331:
SECTION 07270 - FIRESTOPPING PART 1
- Page 332 and 333:
B. Ventilation: Ventilate firestopp
- Page 334 and 335:
2.04 MIXING requirements, including
- Page 336 and 337:
SECTION 07410 - PRE-FORMED METAL PA
- Page 338 and 339:
SECTION 07411 - MANUFACTURED ROOF P
- Page 340 and 341:
SECTION 07430 - COMPOSITE PANELS PA
- Page 342 and 343:
B. Substitutions: Any substitution
- Page 344 and 345:
2.02 MATERIALS a. Rout and return t
- Page 346 and 347:
PART 3 - EXECUTION 3.01 DELIVERY AN
- Page 348 and 349:
SECTION 07511 - BUILT-UP ASPHALT RO
- Page 350 and 351:
Project. Inspector to be on the job
- Page 352 and 353:
2.02 ROOFING MEMBRANE PLIES A. Ply
- Page 354 and 355:
3.03 PREPARATION 4. Proceed with in
- Page 356 and 357:
3.07 FLASHING AND STRIPPING INSTALL
- Page 358 and 359:
ALPINE SCHOOL DISTRICT ROOFING WARR
- Page 360 and 361:
SECTION 07542 - POLYVINYL-CHLORIDE
- Page 362 and 363:
3. Review and finalize construction
- Page 364 and 365:
C. Fasteners: Factory-coated steel
- Page 366 and 367:
B. Final Roof Inspection: Arrange f
- Page 368 and 369:
SECTION 07600 - FLASHING AND SHEET
- Page 370 and 371:
or equivalent. Securely fasten and
- Page 372 and 373:
SECTION 07720 - ROOF ACCESSORIES PA
- Page 374 and 375:
SECTION 07900 - JOINT SEALANTS PART
- Page 376 and 377:
1.06 DELIVERY, STORAGE, AND HANDLIN
- Page 378 and 379:
C. Products: Subject to compliance
- Page 380 and 381:
3.04 CLEANING discolor sealants or
- Page 382:
DIVISION 8 - DOORS AND WINDOWS Sect
- Page 385 and 386:
F. Galvanize exterior frames, hot d
- Page 387 and 388:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 389 and 390:
A. Provide manufacturer's warranty
- Page 391 and 392:
END OF SECTION SEGO LILY ELEMENTARY
- Page 393 and 394:
PART 2 - PRODUCTS 2.01 MANUFACTURER
- Page 395 and 396:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 397 and 398:
1.05 DELIVERY AND STORAGE A. Frames
- Page 399 and 400:
3.04 HARDWARE GROUPS A. General: Pr
- Page 401 and 402:
PART 2 - PRODUCTS 2.01 MANUFACTURER
- Page 403 and 404:
C. Closers shall be adjusted to a r
- Page 405 and 406:
SET #AL-4 SET #01 SET #02 SET #03 2
- Page 407 and 408:
SET #09 SET #10 SET #11 SET #12 SET
- Page 409 and 410:
END OF SECTION SEGO LILY ELEMENTARY
- Page 411 and 412:
1.06 MEASUREMENTS deterioration due
- Page 413 and 414:
3.01 PREPARATION A. At the Contract
- Page 415 and 416:
c. Coated Outdoor Lite: Low E Coati
- Page 417 and 418:
E. Submit complete energy and struc
- Page 419 and 420:
D. Exterior Face: Provide a permane
- Page 421 and 422:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 424 and 425:
SECTION 09250 - GYPSUM BOARD ASSEMB
- Page 426 and 427:
. At door jambs c. At walls with ti
- Page 428 and 429:
10. Install metal corner reinforcem
- Page 430 and 431:
SECTION 09300 - TILE PART 1 - GENER
- Page 432 and 433:
2.02 PRODUCTS, GENERAL b. Dal-Tile
- Page 434 and 435:
a. Products: Mapei Ker 200 or appro
- Page 436 and 437:
tile against adherence of mortar an
- Page 438 and 439:
D. Before final inspection, remove
- Page 440 and 441:
SECTION 09510 - ACOUSTICAL CEILINGS
- Page 442 and 443:
. Edge: Angled tegular. c. CAC: 35
- Page 444 and 445:
B. Extra Stock: Deliver stock of ma
- Page 446 and 447:
SECTION 09650 - RESILIENT FLOORING
- Page 448 and 449:
serviceability of the accessories.
- Page 450 and 451:
3.05 EXTRA MATERIALS Completion. 3.
- Page 452 and 453:
SECTION 09680 - CARPET PART 1 - GEN
- Page 454 and 455:
hours (Xenon Arc) shall be not less
- Page 456 and 457:
SECTION 09900 - PAINTING PART 1 - G
- Page 458 and 459:
1.06 JOB CONDITIONS A. Apply water-
- Page 460 and 461:
conditions within any particular ar
- Page 462 and 463:
E. Pigmented (Opaque) Finishes: Com
- Page 464:
DIVISION 10 - SPECIALTIES Section 1
- Page 467 and 468:
1.05 DELIVERY AND STORAGE A. All pr
- Page 469 and 470:
PART 3 - EXECUTION A. INSTALLATION
- Page 471 and 472:
. Installation instructions. c. Rep
- Page 473 and 474:
A. All hardware through bolted to d
- Page 475 and 476:
A. Available Manufacturers: Subject
- Page 477 and 478:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 479 and 480:
source of a single manufacturer. C.
- Page 481 and 482:
B. Aluminum Finishes: Finish design
- Page 483 and 484:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 485 and 486:
2. Larsen's Manufacturing Co. 3. Po
- Page 487 and 488:
1.06 WARRANTY A. Warranty: Submit a
- Page 489 and 490:
END OF SECTION a. Provide two per j
- Page 492 and 493:
SECTION 11132 - PROJECTION SCREENS
- Page 494 and 495:
SECTION 11451 - APPLIANCES PART 1 -
- Page 496 and 497:
B. Built-in Equipment: Securely anc
- Page 498:
DIVISION 12 - FURNISHINGS Section 1
- Page 501 and 502:
1.05 DELIVERY, STORAGE AND HANDLING
- Page 503 and 504:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 505 and 506:
h. Flammability: ASTM E-648, Class
- Page 507 and 508:
covered by these specifications. Sh
- Page 509 and 510:
issue instructions as to procedure.
- Page 511 and 512:
that the various mechanical system
- Page 513 and 514:
30. Automatic temperature controls
- Page 515 and 516:
The contractor shall remove all sta
- Page 518 and 519:
SECTION 15030 - SYSTEM COMMISSIONIN
- Page 520:
1. Strainers and filters. 2. Visual
- Page 523 and 524:
PART 2.00 - PRODUCTS EQUIPMENT: The
- Page 525 and 526:
The Owner's representative will tra
- Page 527 and 528:
Temperature Tabulation: Of all cond
- Page 530 and 531:
SECTION l5050 - BASIC MATERIALS AND
- Page 532 and 533:
sealed watertight with flexible wat
- Page 534 and 535:
Any or all welders may be required
- Page 536 and 537:
Care shall be taken by this contrac
- Page 538 and 539:
the installation. All supports shal
- Page 540 and 541:
Balancing cocks 1-1/2" and smaller
- Page 542 and 543:
Ground joint unions shall be instal
- Page 544 and 545:
Materials and construction shall be
- Page 546 and 547:
Motors provided with automatic cont
- Page 548 and 549:
All equipment not anchored directly
- Page 550 and 551:
glycol solution in addition to the
- Page 552 and 553:
VALVE IDENTIFICATION CHART NUMBER D
- Page 554 and 555:
On chalky and loose insulation, sof
- Page 556 and 557:
Install each direct-connected motor
- Page 558 and 559:
marks on the exterior of the pipe o
- Page 560 and 561:
Locations: Install thermometers and
- Page 562 and 563:
SECTION 15180 - INSULATION PART 1.0
- Page 564 and 565:
CHILLED WATER STORAGE TANKS: All co
- Page 566:
Adhesives, mastics, and coatings sh
- Page 569 and 570:
epeated if samples taken daily over
- Page 571 and 572:
SS-1 Service Sink: Kohler K-6710 "W
- Page 573 and 574:
cocks. Backflow preventers shall be
- Page 575 and 576:
Special short radius fittings shall
- Page 577 and 578:
Cleanout Plugs For Copper Drainage
- Page 580 and 581:
SECTION 15500 FIRE PROTECTION PART
- Page 582 and 583:
usiness of Fire Sprinkler contracti
- Page 584 and 585:
as required by NFPA Standards and I
- Page 586 and 587:
SECTION 15700 HEATING-COOLING PART
- Page 588 and 589:
___________________________________
- Page 590 and 591:
___________________________________
- Page 592 and 593:
___________________________________
- Page 594 and 595:
___________________________________
- Page 596 and 597:
section. Optional grease fittings e
- Page 598 and 599:
___________________________________
- Page 600 and 601:
___________________________________
- Page 602 and 603:
___________________________________
- Page 604 and 605:
BASE-MOUNTED PUMPS: Furnish and ins
- Page 606 and 607:
WATER TREATMENT FOR HOT WATER SYSTE
- Page 608 and 609:
SECTION 15800 - AIR DISTRIBUTION PA
- Page 610 and 611:
Where ducts pierce roof constructio
- Page 612 and 613:
Ducts, unless otherwise approved, s
- Page 614 and 615:
lade balancing dampers. Diffusers t
- Page 616 and 617:
hour salt spray under ASTM B117 tes
- Page 618 and 619:
Size Cv 4 209 5 315 6 462 7 612 8 8
- Page 620 and 621:
holes for enclosed duct mounting. A
- Page 622 and 623:
Ducts at Masonry: Where ducts are s
- Page 624 and 625:
SECTION 15900 - BUILDING MANAGEMENT
- Page 626 and 627:
d. Sound Card with Speakers e. 60 G
- Page 628 and 629:
2.5 DDC EQUIPMENT properly integrat
- Page 630 and 631:
non-volatile memory, which is not d
- Page 632 and 633:
operating parameters on programming
- Page 634 and 635:
VAV supply air damper closed. b. Wh
- Page 636 and 637:
4.3 BOILER OPERATION - HOT WATER SY
- Page 638 and 639:
K. The outside air dampers and reli
- Page 640 and 641:
e. EXHAUST FANS START-STOP f. 120 F
- Page 642 and 643:
Graphic 2 - Classroom temperature s
- Page 644 and 645:
Graphic 5 - Hot Water Screen SEGO L
- Page 646 and 647:
Graphic 7 - Power Monitoring Screen
- Page 648 and 649:
Graphic 9 - VAV Box Screen SEGO LIL
- Page 650:
B. Demonstrate complete system oper
- Page 654 and 655:
SECTION 16050 - BASIC ELECTRICAL MA
- Page 656 and 657:
J. Contractor further agrees that i
- Page 658 and 659:
I. Floor boxes which contain voice
- Page 660 and 661:
B. Nameplates shall be 1/16 inch th
- Page 662 and 663:
and there shall be no plastic sheet
- Page 664 and 665:
C. As-Built Submittals: a. Depths o
- Page 666 and 667:
SECTION 16050 - BASIC ELECTRICAL MA
- Page 668 and 669:
J. Contractor further agrees that i
- Page 670 and 671:
I. Floor boxes which contain voice
- Page 672 and 673:
B. Nameplates shall be 1/16 inch th
- Page 674 and 675:
and there shall be no plastic sheet
- Page 676 and 677:
C. As-Built Submittals: a. Depths o
- Page 678 and 679:
SECTION 16115 - CABLE TRAY PART 1 -
- Page 680 and 681:
access with minimum number of offse
- Page 682 and 683:
SECTION 16120 - WIRES & CABLES PART
- Page 684 and 685:
SECTION 16130 - RACEWAYS PART 1 - G
- Page 686 and 687:
jumper. Prior to installation, veri
- Page 688 and 689:
SECTION 16140 - SWITCHES & RECEPTAC
- Page 690 and 691:
SECTION 16425 - SWITCHBOARDS 600 VO
- Page 692 and 693:
SECTION 16470 - PANELBOARDS PART 1
- Page 694 and 695:
SECTION 16475 - MOTOR CONTROLLERS P
- Page 696 and 697:
5. The starter shall have fault iso
- Page 698 and 699:
SECTION 16478 - TRANSIENT VOLTAGE S
- Page 700 and 701:
B. The TVSS shall be compatible wit
- Page 702 and 703:
SECTION 16500 - LIGHTING PART 1 - G
- Page 704 and 705:
Power factor equal to or greater th
- Page 706 and 707:
C. After the poles have been instal
- Page 708 and 709:
SECTION 16530 - LIGHTING CONTROL PA
- Page 710 and 711:
SECTION 16550 - OCCUPANCY SENSED LI
- Page 712 and 713:
F. Shall have a standard 30 element
- Page 714 and 715:
T. Ultrasonic microphone receiver f
- Page 716 and 717:
SECTION 16723 - FIRE ALARM SYSTEMS
- Page 718 and 719:
2.1 ACCEPTABLE MANUFACTURERS: A. FC
- Page 720 and 721:
12. Walk test 13. Check system on b
- Page 722 and 723:
A. Remote identification module dev
- Page 724 and 725:
A. Provide supplementary notificati
- Page 726 and 727:
SECTION 16760 - INTEGRATED ELECTRON
- Page 728 and 729:
1.6 QUALITY ASSURANCE: A. All items
- Page 730 and 731:
G. Any prior approval of an alterna
- Page 732 and 733:
M. The administrative phones shall
- Page 734 and 735:
25. Facilities to automatically alt
- Page 736 and 737:
1. Boiler Rooms & Outside Speakers
- Page 738 and 739:
locks and identified by the actual
- Page 740 and 741:
SECTION 16771 - CLASSROOM SOUND REI
- Page 742 and 743:
SECTION 16780 - TELEVISION SYSTEMS
- Page 744 and 745:
B. Broad Band Amplifier: Blonder To
- Page 746 and 747:
SECTION 16781 - SECURITY INTRUSION
- Page 748 and 749:
B. Power Supply Panel: Bosch No. RK
- Page 750 and 751:
END OF SECTION 16781 1. CAD drawing
- Page 752 and 753:
SECTION 17000 - TELEPHONE AND DATA
- Page 754 and 755:
A. The typical telecommunications w
- Page 756 and 757:
1. CACHE VALLEY ELECTRIC COMPANY -
- Page 758 and 759:
A. Single-gang mounting plate SIEMO
- Page 760 and 761:
1) Provide Siemon horizontal cable
- Page 762 and 763:
outed in the ceiling space and not
- Page 764 and 765:
D. Label cables, outlets, patch pan
- Page 766:
APPENDIX A Geotechnical Report SEGO
- Page 769 and 770:
SEGO LILY ELEMENTARY SCHOOL CLASSRO
- Page 772 and 773:
! ! TABLE OF CONTENTS 1.0 INTRODUCT
- Page 774 and 775:
! 1.0 INTRODUCTION "#$%! &'()&*! (&
- Page 776 and 777:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 778 and 779:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 780 and 781:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 782 and 783:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 784 and 785:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 786 and 787:
!"#$"%&'(%)*+,'-('"".('-+/"0#.$+ 1"
- Page 788 and 789:
SITE Project: Proposed Addition to
- Page 790 and 791:
! APPENDIX B Log of Borings Summary
- Page 792 and 793:
PSI Job No.: 710-85060 Project: Pro
- Page 794 and 795:
PSI Job No.: 710-85060 Project: Pro
- Page 796:
Boring ID Depth (feet) Liquid Limit