28. Temporary Field Office, Storage Each Subcontractor, as required<br />

Vans, Parking Arrangements,<br />

Secure Fenced Storage Area<br />

(if space is available), etc.<br />

29. Water Hoses and Extension Cords Each Subcontractor<br />

30. Temporary Shoring, Cribbing, Each Subcontractor, as required<br />

Bracing and Slope Protection<br />

31. Unloading and Conveying Each Subcontractor<br />

of Material<br />

32. Scaffolding, Staging, Planking Each Subcontractor, as required<br />

and Plywood Roof Protection<br />

33. Engagement of Testing Laboratory Owner<br />

Services for the testing of soils,<br />

concrete and asphalt paving<br />

34. Night Watchman or Security Service None will be provided<br />

35. As-Built Drawings, accurately Each Subcontractor, on a weekly basis<br />

showing position and elevation<br />

of Subcontractor’s installed work<br />

36. All other items not specifically Each Subcontractor, as required<br />

described herein as being provided<br />

by General Contractor<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

PROJECT SCHEDULES 00500 - 3