hours (Xenon Arc) shall be not less than 3.<br />

E. Miscellaneous:<br />

1. Adhesive: Water-resistant carpet adhesive of type recommended by carpet mill.<br />

2. Seaming Cement: Hot-melt type recommended by mill.<br />

PART 3 - EXECUTION<br />

3.01 EXAMINATION<br />

A. Examine all subsurfaces to receive work and report, in writing to the Owner and/or<br />

<strong>Construction</strong> Manager, any conditions detrimental to the work. Failure to observe this<br />

injunction constitutes a waiver to any subsequent claims to the contrary. Commencement of<br />

work will be construed as acceptance of all subsurfaces.<br />

B. Do not install carpet over concrete with either excessive moisture or dust producing surface<br />

which is not adequately sealed.<br />

3.02 GENERAL<br />

A. Prepare subsurfaces, layout, trim, seam, stretch, tuck, and provide all necessary operations<br />

required for a complete installation.<br />

B. Surfaces to receive carpet shall be damp mopped, clean and dry.<br />

C. Allow installation a minimum of 24 hours to cure before subjecting it to any traffic, moving of<br />

furniture, or other heavy equipment.<br />

3.03 PRE-INSTALLATION REQUIREMENTS<br />

A. Clear away debris, cementitious deposits, and similar obstructions or substances. Fill cracks<br />

and voids including honeycombed concrete.<br />

B. Sequence carpeting installation with other work in a manner which will minimize possibility of<br />

damage or deterioration to carpeting, and yet not delay completion of the project.<br />

C. Clean surfaces to be carpeted immediately prior to installation of carpeting materials, by<br />

vacuum cleaning and damp mopping.<br />

D. Dimensions: Prior to start of carpet installation, check critical dimensions of space to be<br />

carpeted, to ensure that planned use of materials will fulfill requirements, including locations<br />

for seams, joints and edgings.<br />

E. Areas scheduled to receive carpeting shall be heated to 70 degrees F. or above for not less<br />

than 24 hours prior to carpet installation. Maintain temperatures for the full duration of the<br />

installation period.<br />

3.04 INSTALLATION<br />

A. Comply with the manufacturer’s instructions and recommendations. Place seams in directions<br />

indicated and as accepted in prior submittals. Maintain direction of pattern and texture,<br />

including lay of pile. Do no seam weft to warp, except as specifically indicated for a direction<br />

change.<br />

B. Extend carpet under open-bottomed and raised-bottom obstructions, and under removable<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

CARPET 09680 - 3