2.01 PAYMENT FOR TESTING SERVICES<br />

A. Initial Services: The Owner will pay for all initial testing services.<br />

B. Retesting: When the initial tests indicate noncompliance with the Contract Documents, all<br />

subsequent retesting occasioned by the noncompliance shall be performed by the same<br />

agency, and the costs thereof will be paid by the Contractor.<br />

2.02 CODE COMPLIANCE TESTING (SPECIAL INSPECTI0NS):<br />

A. Inspections and tests required by codes or ordinances, or by a plan approval authority, and<br />

made by a legally constituted authority, shall be the responsibility of, and shall be paid for by<br />

the Owner.<br />

2.03 TESTING REQUIRED BY THE SPECIFICATIONS:<br />

A. Inspection or testing performed to fulfill other requirements within these specifications, shall<br />

be the sole responsibility of the Contractor.<br />

2.04 CONTRACTOR'S CONVENIENCE TESTING:<br />

A. Inspection or testing performed exclusively for the Contractor's convenience shall be the sole<br />

responsibility of the Contractor.<br />

PART 3 - EXECUTION<br />

3.01 COOPERATION WITH TESTING AGENCY:<br />

A. Representatives of the testing agency shall have access to the work at all times. Provide<br />

facilities for such access in order that the agency may properly perform its functions.<br />

3.02 SCHEDULES FOR TESTING:<br />

A. By advance discussion with the testing agency selected by the Contractor, determine the time<br />

required for the testing agency to perform its tests and to issue each of its findings.<br />

Provide all required time within the construction schedule.<br />

B. When changes of construction schedule are necessary during construction, coordinate all<br />

such changes of schedule with the testing agency as required.<br />

3.03 TAKING SPECIMENS:<br />

A. All specimens and samples for testing will be taken by the testing agency, all sampling<br />

equipment and personnel will be provided by the testing agency, and all deliveries of<br />

specimens and samples to the testing laboratory will be performed by the testing agency.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

TESTING AND LABORATORY SERVICE 01400-2