10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The contractor shall comply with all local and OSHA safety requirements in performance with this work. (See<br />

General Conditions). This contractor shall be required to provide equipment, supervision, construction,<br />

procedures, and all other necessary items to assure safety to life and property.<br />

OWNER FURNISHED EQUIPMENT:<br />

This contractor shall include in his bid the necessary labor and material to properly coordinate and install the<br />

required piping, trim, specialties, controls, ductwork, and other necessary utilities and services to equipment<br />

furnished by the Owner.<br />

This contractor shall relocate (where noted), rough-in and make final connections to owner furnished equipment.<br />

ASBESTOS & HAZARDOUS WASTES:<br />

Unless specifically included elsewhere in these contract documents, the removal of asbestos fiber bearing<br />

material or materials containing hazardous wastes are not a part of this contract. Should such material be<br />

identified on the contract site, the owner's representative shall be so notified.<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!